What is the reason for the waterproof bathroom to do a closed water test, and there is a watermark a

Updated on Bathroom 2024-03-25
1 answers
  1. Anonymous users2024-01-23

    That is, the leakage is not done, it is recommended to check it again to ensure that it does not leak!

Related questions
4 answers2024-03-25

The closed water test is mainly to see if the water will seep into the downstairs, and the watermark on the upstairs wall is because the cement will absorb water, which causes the watermark, and you can make the waterproof higher.

1 answers2024-03-25

At the beginning of the closed water experiment, it is necessary to notify the residents of the lower floor, and there is no need to notify the lower floor; When the water level drops, the first part needs to go to the downstairs residents or the downstairs floor to check whether the top surface of the bathroom is leaking or damp, if not, this item can be ruled out; The second is to check whether the water is lost due to floor drains or sewage pipes that are not blocked; Third, check whether the windows are closed, there is no air flow through, or the weather is very hot and dry, etc., if these reasons are too large, the water will evaporate and the water level will drop.

7 answers2024-03-25

After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.

22 answers2024-03-25

The bathroom must do a closed water test, because it is easy to cause water leakage if the waterproof is not done well. If you live downstairs, you will be unlucky. The closed water test should generally be done after doing a good job of waterproofing, and now the floor tiles are pasted and then done, if the water leaks, the floor tiles can only be dug up. >>>More

5 answers2024-03-25

24 hours, after the waterproof layer is made, wait until the material is dried to the specified time, and do a closed water test. >>>More