How to install a lifting clothes pole after PVC ceiling?

Updated on Suspended ceilings 2024-03-21
1 answers
  1. Anonymous users2024-01-23

    The installer will use the extension drill bit and the extension bolt to install, you only need to explain to the installer in advance that "the ceiling sagging height is on the line." ”

Related questions
1 answers2024-03-21

The good point of lifting is that it is not so laborious to use, and it is also more beautiful.

2 answers2024-03-21

1. Measure the position of the hand that needs to be installed in any corridor of the first-hand installation hand, use electric drilling, install the expansion rubber plug, and tighten the manual place. >>>More

6 answers2024-03-21

Most of the balcony ceilings are made of aluminum gusset or PVC gusset, etc., which are generally about 10cm away from the top surface of the balcony ceiling, which requires automatic lifting of the drying rack to install and cooperate with it. >>>More

4 answers2024-03-21

To install the yin angle line, you need to draw the horizontal line of the yin angle line on the wall to be installed, and it should be noted that this horizontal line is measured from the floor of the house, and the horizontal line cannot be measured downward from the position of the ceiling. After that, we have to drill holes in the wall along the upper part of the horizontal line that we have just drawn, about every half a meter, and then we will stuff wooden wedges into the holes. >>>More

6 answers2024-03-21

In fact, the order of balcony ceiling and outdoor lifting drying rack should be installed first with clothes poles and then balcony ceiling. When installing a lifting drying rack, if you want a balcony ceiling, you must first fix it to the ceiling with steel bars to ensure that the length of the steel bars can expose the ceiling by about 1-2 cm. When the ceiling is finished, the drying rack will be installed on the steel bar, so as to facilitate future maintenance and repair. >>>More