How to calculate the engineering quantity of bedroom ground and bedroom bathroom floor

Updated on Bathroom 2024-03-31
2 answers
  1. Anonymous users2024-01-23

    Protruding columns that are less than square meters do not deduct the area, and the length times the width is the ground area.

  2. Anonymous users2024-01-22

    I don't know which city you are There are different algorithms Changsha is the bedroom to find a flat wet cement mortar More than three centimeters How much does it cost to add a square meter The bathroom floor is dry mortar plus pure cement paving After the dry mortar is more than five centimeters, there is an additional charge.

Related questions
1 answers2024-03-31

The installation of toilet equipotential boxes implements the general junction box installation quota, and the material cost is calculated separately according to the actual situation. If the grounding wire welding to the equipotential box uses the main reinforcement in the civil ring beam, the base price of the equalizing ring laying sub-item can be multiplied by the coefficient, and if a separate flat steel or round steel is used, the quota of "indoor grounding bus laying" can be implemented. If there is a steel plate, the iron plate can be calculated according to the iron component production, installation, and calculation.

4 answers2024-03-31

In home decoration, we generally need to do kitchen, bathroom, balcony including if your home is on the ground floor, then all the ground and walls below the wall need to be waterproof and moisture-proof.

1 answers2024-03-31

Let's not talk about feng shui, the bathroom is blocked, but it's enough for you.

15 answers2024-03-31

The color of the kitchen should not be black or blue. Black and blue are the colors of water vapor, which seriously extinguishes the fire of the stove and easily leads to the lack of prosperity of the house. In general, light and bright colors, such as white and green, should be used as the main colors, and the kitchen floor should be dark and heavy colors. >>>More

1 answers2024-03-31

It should be calculated twice, because it includes the cost of labor and materials, and it is reasonable to count it twice.