I changed the water and electricity, the ceiling, calculated by the square. Water is not counted

Updated on Suspended ceilings 2024-03-22
1 answers
  1. Anonymous users2024-01-23

    It is advisable to post on the local forum, the platform here is too large and oriented to the whole country!

Related questions
6 answers2024-03-22

Hydropower installation charges have their own standards, installation companies and individual plumbers charge differently, it depends on how you set with them, the standard is dead, people are alive, and ultimately it depends on you to set, I hope to help you.

1 answers2024-03-22

It is best not to hang the ceiling first, so it will be very inconvenient to change the water and electricity, and it may need to be removed and re-hoisted, which is not cost-effective.

2 answers2024-03-22

It can be calculated by projected area or by area. If it is a linear reflective roof, it is calculated by area, and the area refers to the bottom surface plus (the size of the distance between the ceiling and the roof) and then multiplied by the total length to obtain the area of the ceiling, and the area of the ceiling is calculated, in fact, it is the area of gypsum board, such as 20 square meters is 4 5, and the calculation method is 4 (square meters.

1 answers2024-03-22

Generally, the price is calculated according to the ceiling area. If it is just hanging the wall for a week, there are also calculated by meters, and some simply estimate how much is a top.

3 answers2024-03-22

When decorating, the water and electricity are changed first, then the floor heating is laid, then the bricks are laid, and finally the carpentry is the work.