Make the ground first, so that the waterproof effect is good, and after the ground is dry, put screws on the ground, and fix the toilet with Peng Chang screws, (to smear cement or glass glue on the base).
-
Go to the toilet first, then fix the waterproofing, repair the tiles, and then install a new toilet. It's better to be waterproof this way.
-
Do the ground first, the ground is not done, how to make the toilet, dizzy.
-
It should be done first on the floor and then on the toilet.
-
It's all right, it's up to you to do things, and it's the same way.
In my opinion, large areas of walls tend to be neutral and light-colored, which can not only bring out furniture and other utensils, but also easily make the interior achieve a harmonious and unified artistic effect. The color of the living room is mostly neutral, that is, the color between cold and warm colors, and the floor, ceiling and wall are suitable for light colors, with high color brightness, and a dark coffee table. >>>More
Depending on the room, the order of tiling or ceiling is different. >>>More
Generally, the normal is to seal the balcony first and then deal with the wall, but because the construction environment and the material steps of the balcony are different, you can also paint first and then seal the balcony (generally this situation is easy to damage the wall paint, as long as the construction is guaranteed not to damage the wall paint, it can be constructed).
Make the floor first, then put the toilet bowl and seal it with silicone. >>>More
1.The normal is to install the ceiling first, after the ceiling is installed, determine the height of the entire cabinet, our wall cabinet can not lean on the top of the wall cabinet, to avoid sanitary dead ends. >>>More