It is best not to use it, because the elevation of the toilet floor is generally not high, and the waterproof layer must be completed, and the floor tiles will be pasted after the water storage test, and the construction waste will easily cause damage to the waterproof layer. Please refer to it.
-
You can fill the toilet floor, pay attention to tamping.
Find someone who does a whole kitchen, and let him help you make a water and electricity map, and change the wiring where the cabinets can block it.
I calculated that the contractor (excluding tiles) is: about 1200 for wall painting, about 800 for waterproofing, about 1500 for tiling and paving, and about four or five hundred for smashing the wall, and the hydropower transformation should not exceed 800 depending on the situation. The total is only 4800. >>>More
It is necessary to pay attention to follow the principle of "walking to the top and not to the ground, and walking vertically but not horizontally" as much as possible. >>>More
The ceiling has the functions of heat preservation, heat insulation, sound insulation and sound absorption, and is also a hidden layer for electrical, ventilation and air conditioning, communication and fire prevention, alarm pipeline equipment and other projects. >>>More
TV sockets; set-top box socket; DVD or Blu-ray player socket; sockets for some household appliances (such as vacuum cleaners); wall-mounted or cabinet air conditioner sockets; mobile phone charging sockets; computer sockets; power sockets for telephone network cables; desk lamp socket; Refrigerator socket (if the living room is equipped with a refrigerator); and so on. >>>More