After buying an integrated ceiling from Alfi, what preparations should I make before installation?

Updated on Suspended ceilings 2024-02-02
4 answers
  1. Anonymous users2024-01-23

    Things to do; 1. It is necessary to confirm whether the wall tiles and floor tiles are pasted according to the standard; Whether the line is laid out according to the requirements: whether the ventilation hole is opened as required, and whether the end of the fume hose connected to the flue hole on the wall is embedded and fixed in place. 2. Kitchen, bathroom countertops and various facilities should be covered with protective materials to avoid damage; Ensure that the site is energized before installation, and the trial operation cannot be achieved without power.

    3. Install the cabinet in place before entering the installation, if you plan to install the cabinet under the ceiling, install the ceiling first and then install the cabinet. 4. The installation of the water heater is fully hidden or semi-hidden, please install the water heater in place before installing the ceiling, if you want to install it below the ceiling, then install the ceiling after installation.

  2. Anonymous users2024-01-22

    1. It is necessary to confirm whether the wall tiles and floor tiles are pasted according to the standard; Whether the line is laid out according to the requirements: whether the ventilation hole is opened as required, and whether the end of the fume hose connected to the flue hole on the wall is embedded and fixed in place. 2. Kitchen, bathroom countertops and various facilities should be covered with protective materials to avoid damage; Ensure that the site is energized before installation, and the trial operation cannot be achieved without power.

    3. Install the cabinet in place before entering the installation, if you plan to install the cabinet under the ceiling, install the ceiling first and then install the cabinet. 4. The installation of the water heater is fully hidden or semi-hidden, please install the water heater in place before installing the ceiling, if you want to install it below the ceiling, then install the ceiling after installation. It can be seen on the official website of the Alfi European integrated ceiling.

  3. Anonymous users2024-01-21

    If you buy an integrated ceiling that contains installation and auxiliary materials, you don't need to prepare anything, just remember to open the door for the installer.

  4. Anonymous users2024-01-20

    Jiaxing Erfei Electric Appliance Co., Ltd. is located in Wangdian Town Small Household Appliance Science and Technology Industrial Park, is a small household appliance enterprise mainly producing heater switches and integrated household appliances, integrating design, development, production and sales. We have a certain production scale and perfect after-sales service system, and are committed to building the top brand in the ceiling industry and are committed to building their own ceiling brand. We have a first-class management and R&D team, and are determined to build a first-class brand in the industry.

Related questions
8 answers2024-02-02

I am, the technology package you are satisfied!

5 answers2024-02-02

Wooden keel ceiling:

Keel brush fireproof coating twice, keel tenon, fixed with iron nails, each joint with two iron nails fixed, made into a 300 * 300 or 400 * 400 frame, installed on the top, (it is forbidden to use a rigid row of nails, nails to fix the frame), adjust the height, straight, after acceptance of the gypsum board, the use of self-tapping fixation, self-tapping density: 20cm, the edge part should be denser. >>>More

2 answers2024-02-02

The kitchen and bathroom should be done with water and electricity first, and the kitchen should first set the location of the sink of the hood and stove, change the hot and cold water pipes to the sink cabinet, and leave a socket on the side of the hood. The bathroom is set the position of the water heater wash basin, the water heater power supply and the power supply of the ceiling bath bomb lamp. After doing a good job in the hydropower project, the bricks are paved in the waterproof, the ceiling is fixed after the tiles are paved, and the size of the cabinet is measured. >>>More

2 answers2024-02-02

The installation of integrated ceilings is generally divided into the following steps: >>>More

2 answers2024-02-02

The integrated ceiling has won the favor of home improvement consumers with its beautiful appearance, convenient installation and unified style. I believe that there are many people who still do not understand the installation precautions of the integrated ceiling, now let's discuss this problem together! >>>More