Lay parquet flooring, do you need to groove the ground wiring?

Updated on Solid wood 2024-02-29
3 answers
  1. Anonymous users2024-01-23

    Home improvement circuit construction wiring, the conservative approach of ground wiring is to bury the wire after cement height leveling;

    The flatness of the ground of the newly delivered gross bad house is poor; Most constructions will be leveled and heightened for the purpose of alignment;

    Floor and wall slots must be filled after slotting. It's just that the fixed conduit is not filled.

    It not only buried the line pipe but also found the ground more flat.

    Very few slotted wiring in the original ground: because the ground slotted electric hammer vibration is easy to hurt the floor slab. Some underfloor heating floors are reserved for walk-out areas. Although leveling will lead to an increase in the cost of leveling the entire room, safety comes first.

  2. Anonymous users2024-01-22

    Very simply, laying flooring, especially laminate flooring, the ground must be flat and dry, if the tile surface is higher than the cement floor to be paved than the thickness of the floor you want to install too much (such as more than centimeters), then you have to add cement slurry. As for the waterline pipe, it must be slotted underground, and it is required not to be higher than the leveled cement floor. Remember to slotted and install the waterline pipe to be smoothed with cement slurry.

  3. Anonymous users2024-01-21

    To install parquet, the steps are as follows:

    1. The board used in the floor needs to have a card slot, so as to fix the firmness of the wood splicing 2. When laying the floor, it is necessary to combine the firmness of the fixation, cut off the card slot, and make one side fixed firmly, so that it can be installed firmly.

    3. The use of composite flooring is conducive to the convenience of laying, and different shapes of slotting are selected according to the installation method.

Related questions
1 answers2024-02-29

No, because the decoration is to do water, electricity and heating first, then masonry, and then carpentry, because only these previous hidden projects that need to be slotted in advance are done before carpentry begins, because the solid wood floor must be ridged, so carpentry will be on the ground when the ridge is laid, and the floor is the furniture after what is done and finally paved. In addition, the floor tiles are made during the masonry, so there is no need to groove the floor tiles or solid wood floors when the concealed project is done, and the wires and water pipes are hidden in the ridges.

1 answers2024-02-29

On the floor is a layer of wear-resistant layer called aluminum oxide, and buying the floor mainly depends on the wear resistance of this wear-resistant layer and the environmental protection level of the floor. Floor essential oil is to play a maintenance role on the floor, and the wear-resistant layer is good, the new floor can also be used without essential oil, to use, the floor is used after a year or two. With essential oils, be sure to wipe the floor clean first. >>>More

5 answers2024-02-29

It is recommended to choose deep carbonized wood for the balcony, which is wood treated by high temperature and high pressure oxygen-free and water-free European carbonization technology. >>>More

3 answers2024-02-29

When consumers decide to use wooden flooring as a floor decoration material, they must follow the following steps to make a purchase: >>>More

4 answers2024-02-29

In terms of moisture-proof wood flooring, a layer of PE geotechnical moisture-proof film will be paved on the waterproof ground first, and then the elastic shock-absorbing pad of basketball wood floor will be fixed (elastic cushion materials include PU, rubber, recycled rubber, PVC and other different varieties), mainly providing strong functions of shock absorption and moisture-proof for the entire sports wood floor structural system. >>>More