If the bathroom wall skin is removed, do you wipe the wall first or go first with water and electric

Updated on Bathroom 2024-02-29
3 answers
  1. Anonymous users2024-01-23

    This is the basic common sense of decoration, you must first go to water and electricity, and then plaster the wall and tile.

  2. Anonymous users2024-01-22

    Of course, the water and electricity were changed first, and when the wall was plastered, the trench pipe was covered.

  3. Anonymous users2024-01-21

    Must do waterproofing first, waterproofing is very important, waterproofing will not do a good job will affect the bathroom will leak later, waterproof after the water and electricity pipeline, after the pipeline is installed, and then touch the wall, this is the most basic decoration order.

Related questions
2 answers2024-02-29

See if there is a beam on the top surface of your kitchen and bathroom, the bottom of the beam is pasted to the beam, and the beam height is pasted to about a meter. If you use 300*450 wall tiles and paste 5 and a half pieces, it will be almost the same with the waistline.

3 answers2024-02-29

Make the floor first, then put the toilet bowl and seal it with silicone. >>>More

1 answers2024-02-29

First make floor heating and then make tiles for kitchen and bathroom.

7 answers2024-02-29

Of course, the floor drain is installed first, and try to choose a good quality anti-odor floor drain.

9 answers2024-02-29

You can paste most of the bricks, leave the edge of the door, and close the edge after installing the door.