The waterproof layer of the bathroom is full of small holes

Updated on Bathroom 2024-02-07
1 answers
  1. Anonymous users2024-01-23

    Bathroom leakage is a common problem in building construction, and waterproofing should be done when decorating the bathroom. Next, Xiangxiang summarized the following waterproof technical measures according to the waterproof construction practice of technicians, and received good results in the construction of residential buildings.

    A. The bathroom floor of the residential building is usually 2-3cm lower than the indoor ground, and the water supply and drainage pipes of the toilet pass through the bathroom floor.

    B, the base waterproof technical measures in the construction of the toilet cast-in-place board, according to the design of the toilet wall position, on the board to make a return to 60mm high, width of 60mm concrete waterstop, and cast-in-place plate construction at the same time, and reserve a variety of pipe holes, to avoid digging holes in the floor in the future, leaving hidden dangers of water seepage; The concrete construction of the floor slab must be vibrated and compacted, especially around the pipe and the corner of the wall, it must be smooth to avoid unevenness, and the quality inspector must strictly control the quality, and the unqualified place must be reworked.

    C. The technical measures of the ground cushion to prevent water seepage on the bathroom floor are the foundation of waterproofing, and the reasons for the ground water seepage are roughly as follows: the concrete base is not compact, the wall and the riser are not tightly bonded, the ground cracking caused by material problems, the shrinkage cracks caused by poor concrete maintenance and the gaps at the connection between the toilet and the flush pipe. In order to ensure the quality of the ground cushion, it is recommended to use 1:

    Waterproof cement mortar, and focus on the treatment of transparent waterproofing agent or elastic waterproof coating (liquid) around the pipeline and concrete flanging place to improve the waterproof performance of the structure, and according to the design of 1% of the drainage slope, slope to the floor drain pipe.

    D. The technical measures of non-seepage on the ground are well constructed, which can further help the grassroots to prevent leakage. At present, the bathroom floor generally requires the initial decoration, that is: the surface layer construction is completed by the residents themselves, and the residents are required not to destroy the waterproof layer, to ensure that the ground is not waterlogged, and the mortar should be full when the ground tiles are inlaid, so as to ensure that the inlay is dense and there is no hollowing phenomenon.

    There should be no gaps around the connection with the pipe and the toilet and the corner of the wall, and it is best to use paper cement lime caulking between the water supply pipe and the casing, so as to ensure that the ground is not seepage.

Related questions
10 answers2024-02-07

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

5 answers2024-02-07

Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority. >>>More

6 answers2024-02-07

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

1 answers2024-02-07

1. Environmental protection.

If you choose a product that is not environmentally friendly, after the waterproof layer is made, the harmful gases will be slowly released under the thick floor tiles or cement. Therefore, if you want to buy waterproof materials, you must go to the regular building materials store or supermarket, choose a well-known brand, generally good brand products are equipped with product test reports, product certificates and China environmental labeling certification of the ten ring mark or CTC mark. >>>More

6 answers2024-02-07

Toilet leakage is mainly concentrated in the pipe floor drain and around the corner of the wall, and these parts should be focused on when waterproofing. After the waterproof layer is done, the closed water test is carried out for 3 days, and the corresponding parts are carefully observed downstairs, and the decoration is carried out after there is no water leakage.