How to do waterproofing in the bathroom of the wooden house

Updated on Bathroom 2024-02-29
5 answers
  1. Anonymous users2024-01-23

    The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, and the waterproof paint may be uneven when painting, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied.

    The second step is that if the bathroom wall is not waterproofed, the wall may become mildew or tile peeling off over time. Therefore, it is necessary to do a good job of waterproofing the bathroom wall. The waterproofing of the wall is mainly a problem of the height of the paint.

    Generally, 30cm is painted on the wall from the ground level, which is to prevent the stagnant water from penetrating into the wall and forming a resurgence; However, many families will make a shower room, in this area you need to paint the waterproof paint to 180cm, so that the water of the sprinkler head is not easy to penetrate into the wall; If it's a bathtub, apply the height to 30 cm above the bathtub. Due to the popularity of the shower, the waterproofing treatment of the bathroom is generally tiled.

    In addition, at the junction between the wall and the ground, including the corner part, as well as the junction between the pipe and the building, flexible waterproof coating should be used in these places to achieve the best waterproof effect. Special attention should be paid to these places, and the places that will leak are often these places.

    In the third step, after the waterproof layer is painted, in order to make the waterproof layer and the wall better integrated, so as to prevent damage to the waterproof layer in the subsequent construction, it needs to be given a period of time.

    The fourth step, because the waterproof layer is the work before paving the floor tiles, the back construction will inevitably cause a certain degree of damage to the waterproof layer, after the floor tiles are laid, the bathroom needs to be tested for waterproofing, if the waterproof layer of a place has been destroyed during the test, then you can not smash the wall tiles, but use professional joint materials to block the gaps.

  2. Anonymous users2024-01-22

    Answer: 1 First of all, the ground of the bathroom should be treated flat, and then waterproof treatment, so that the waterproof coating can be effectively avoided and caused by water stain leakage, the thickness of the joint should be painted, the gap between the wall of the bathroom and the ground contact and the gap between the upper and lower pipes and the ground contact is the most problematic place, so the waterproof coating in these places must be applied in place;

    2. After the construction of waterproof treatment in the bathroom is completed, a waterproof test should be carried out to block all the sewers of the sanitary napkin, and then fill the toilet with a certain amount of water, and wait until 24 hours later, and then check to see if there is any water stain leakage. Note that this step is very important, it is the key to ensure the quality of the toilet waterproofing project.

  3. Anonymous users2024-01-21

    The shower room is complete or tiled.

  4. Anonymous users2024-01-20

    With a full bathroom, you can avoid the problem of waterproofing the wooden house.

    Waterproofing is the same as waterproofing in normal houses, but because of the different materials, the materials that need to be used are not the same

  5. Anonymous users2024-01-19

    1. The vent forms an air circulation channel between the roof wooden structural board grip ridge oak and the insulation cotton, which promotes the drying of the structural board and the insulation cotton that may become wet due to leakage or condensation.

    2. The Yeshen vent can reduce the temperature of the roof structural plate in summer and play the role of thermal insulation. Too high the temperature of the roof panel will affect the service life of the fiberglass asphalt shingles, and the ventilation system under the roof panels can reduce the temperature of the tiles by about l4.

    3. Precipitation is the main source of water vapor inside the structure next to the building section, and the roof is the first line of defense against its invasion. In order to facilitate the waterproofing of the roof, timber frame houses should be built with a sloping roof, in which rainwater is discharged from the roof under the action of gravity.

Related questions
9 answers2024-02-29

How do you make a bathroom waterproof? Let's find out.

Bathroom waterproofing needs to be painted with waterproof paint twice, the first waterproof coating needs to ensure that it is firmly combined with the base layer, and then brush the second time after the first paint is dry, and then carry out a closed water experiment after completing the brushing, and observe that there is no leakage before it is completed. >>>More

1 answers2024-02-29

To do a good job of ground waterproofing: before laying floor tiles, we must do a good job of waterproofing engineering; After the tile is laid, it is necessary to ensure that the brick surface has a drainage slope (generally about 1% is appropriate), and the slope is towards the floor drain, which is conducive to wastewater discharge. >>>More

6 answers2024-02-29

1.The waterproof layer of the kitchen, the ground is all waterproof, the wall is 30 cm high, and the waterproof of the water, such as the dishwasher, shall not be lower than the water range. >>>More

5 answers2024-02-29

1. Bathroom waterproof construction steps.

Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

8 answers2024-02-29

The steps to make the bathroom waterproof are as follows: >>>More