Drain Installation! A two story house built by one, with two bathrooms on the upper and lower levels

Updated on Bathroom 2024-02-08
1 answers
  1. Anonymous users2024-01-23

    As long as the main riser is directly raised to a height of about 1 meter above the roof, and a hood is added to the top (of the discharge pipe).

Related questions
3 answers2024-02-08

In modern home decoration, the bathroom is not only a place to wash off the dust, but also a place to relax the nerves and rejuvenate the floor. Therefore, instead of thinking of the bathroom as the most unclean part of the room, as in the past, it should be carefully planned. Today I will tell you how to install the bathroom drain. >>>More

2 answers2024-02-08

Be sure to do a good job of drainage. 1. The water pipe is a hidden project, and the size of the water pipe must be considered more comprehensively when arranging the size of the water pipe, or it is not easy to use in the later stage, and it is more troublesome to maintain. Toilet drain pipe size: The inner diameter of the sewer pipe is 100mm to 3000mm, and the length is 30mm to 200mm. >>>More

3 answers2024-02-08

Be sure to do a good job of drainage. 1. The water pipe is a hidden project, and the size of the water pipe must be considered more comprehensively when arranging the size of the water pipe, or it is not easy to use in the later stage, and it is more troublesome to maintain. Toilet drain pipe size: The inner diameter of the sewer pipe is 100mm to 3000mm, and the length is 30mm to 200mm. >>>More

6 answers2024-02-08

1. Preparation before the installation of the toilet.

1. Before installation, a comprehensive inspection of the sewage pipeline should be carried out to see whether there is mud, sand, waste paper and other debris in the pipeline, and at the same time check whether the ground of the toilet installation position is horizontal. Cut the drain short, and if possible, make the drain 2mm-5mm above the ground. >>>More

1 answers2024-02-08

1 Make a hole in the floor slab.

2. Before the installation of the drainage pipeline, the civil engineering negotiation shall be required to pay off, find the size of the dump of sanitary appliances and the height of the rejection, install the trunk pipe, the riser pipe to the branch pipe in turn, and verify whether the coordinates are accurate again before the civil engineering plugging the floor hole. >>>More