Shopkeeper, my bathroom is leaking, and the floor tiles have been paved, what do you have to fill th

Updated on Bathroom 2024-02-19
5 answers
  1. Anonymous users2024-01-23

    There's no good way. You can only lift the floor tiles in the leaking place, and then re-pave them after the leakage is solved. That's one way. Hope it helps!

  2. Anonymous users2024-01-22

    .You'll have to peel off the floor tiles and repaint the cement floor with "drip and waterproof", or go to the building materials market to see if it's sold.

  3. Anonymous users2024-01-21

    Pry the bricks as soon as possible to fill the leaks, and you'd better contact the downstairs to see if it affects other people's homes, otherwise it will be very troublesome to pull up at that time.

  4. Anonymous users2024-01-20

    I am a senior engineer of China Waterproof Research Institute, according to your situation, if you look at it from a long-term life use; It is not possible to choose to fill the leakage, because according to the current ability of China's waterproof materials and technology, according to your situation, the "leakage" can only be alleviated in wartime, and in the long run, it can only be put aside from the ground tiles and made a new waterproof

    If there is only one way to fill the leak in wartime, aim at the leakage point of your neighbor's bathroom downstairs; Penetration crystallization is carried out by diffusion polyurethane waterproofing crystallization in concrete

    In addition, don't believe any building materials stores, individuals, property recommended to you, plugging treasures, waterproof crystals, etc., 、、、 remember.

  5. Anonymous users2024-01-19

    It depends on what is leaking there. The situation in my house is estimated to be similar to yours, the shower room area seeps water, and has been spreading to the bathroom door through the mortar paving layer under the floor tiles, and the moisture can be seen on the wall, and the wall paint is peeling off and moldy. Our solution now is:

    First remove the threshold of the bathroom, re-waterproof the lower part of the threshold, and close the moisture to prevent it from running out. Then knock off all the floor tiles of the shower room, and redo the waterproofing, and the shower room forms a separate closed water space, so that the water that flows out of the shower room will not seep out. The specific situation is only my personal experience and is for reference only.

Related questions
2 answers2024-02-19

The tile is beige Then the floor tile is recommended to choose a warm color, the color can not be too dull, it is recommended to use a greenish color, but it must be light green in a little yellow, and the light green feeling is also crisp, but not obvious, must be in line with the warm green. Pink is not recommended to be used, and the bathroom is not good looking when the ground is red.

1 answers2024-02-19

The first piece of brick is guaranteed to be a whole brick, and it is not necessarily a whole brick after pasting, it will be cut, and it will become a half brick or a brick, so it is okay to paste it from the door in order to look good.

3 answers2024-02-19

The water pipe is leaking, and you need to find out if it is repaired. >>>More

5 answers2024-02-19

It is not enough to rely on the waterproofing of the gaps, the waterproofing mainly depends on the waterproof layer, such as: Oriental Yuhong or Jindun two-component waterproof coating can be, do not brush too thick every time, after the whole time, there is a layer of waterproof film formed, and then pave the floor tiles.

4 answers2024-02-19

Clean the ground first, plug the leak, fill the water, make a horizontal mark on the wall, and make a satisfactory angle radiation with the horizontal mark at the corner of the wall. Please have the original method of tiling tiles with a level: laser level - purchase - measure - level mark - to make a satisfactory angle radiation with the horizontal mark of the corner of the wall. >>>More