Solid wood flooring production process

Updated on Solid wood 2024-01-27
1 answers
  1. Anonymous users2024-01-23

    Professional production process of sports wood flooring panels:

    1. Filter panel.

    Choose sports wood flooring log panels without knots, decay, insect eyes, collapse, and small color difference;

    2. Panel drying.

    In order to regulate the balanced moisture content of the sports wood floor, the log planks with high humidity should be dried. The joints of the sports wood floor structure, base layer and waterproof protection installation board head should be staggered, and should be relatively symmetrical, and the beauty of cooking, degreasing and insect prevention treatment should be maintained;

    3. Panel polishing.

    According to the design of the sports wood floor panel, the dried sports wood floor panel is polished with a professional polishing machine;

    4. Anti-corrosion treatment.

    Sports wood flooring panels should be treated with anti-corrosion, such as anti-corrosion paint. Termite control measures should also be taken to ensure the anti-ant effect.

Related questions
4 answers2024-01-27

1. Drafting sketch plan: the designer's image representation of the design concept of mahogany furniture, and fixing the prototype of the idea in the form of sketches. At present, freehand drawing and computer drawing are commonly used. >>>More

3 answers2024-01-27

Introduction to the process flow of solid wood furniture 1. The general steps of product production; Preparation of materials, processing, molding, paint assembly, preparation: from logs to boards, etc. Including the cooking and sterilization of the wood, and then drying to about 8% 12% of the water content and water content before the oven can be used. >>>More

2 answers2024-01-27

Raw material aluminum plate The surface of the whole roll of aluminum plate is cleaned and degreased According to different processes, the oxidation pool is anodized or roller coated or brushed with glue or a more complex process The surface is pasted with a protective film The plate is preliminarily divided and cut into the cutting size The plate of the cutting size is stamped, the corner is removed first, and then the edge and buckle are punched out The early treatment of the plate is the most technical, and the stamping behind is the same.

2 answers2024-01-27

1. Cut down fresh logs; 2. Peel off the bark and remove the core of the pith; 3. Fiber crushing into high temperature disinfection and sterilization, and drying to 25% moisture content; 5. Add environmentally friendly resin glue catalyst (containing formaldehyde); 6. Paving tons of high pressure 200 degrees high temperature pat; 8. Plate windmill cooling; 9. Double-sided killing; 10. Plate anti-deformation and health preservation. The production process of layout furniture is: 1. Computer cutting; 2. Mechanical edge banding; 3. High-speed row drilling; 4. Mechanical forming; 5. Quality inspection; 6. Mechanical sanding; 7. Fill putty; 8. sealing and fixing the bottom; 9. Hand sanding; 10. Quality inspection again; 11. spraying primer; 12. Repeated grinding; 13. spraying topcoat; 14. Dust-free drying; 15. Quality inspection again; 16. a three-layer package; The whole process is scientific, rigorous and fully in line with international standards.

1 answers2024-01-27

1. Computer cutting;

2. Mechanical edge banding; >>>More