Generally do you make ceilings or cabinets first?

Updated on Suspended ceilings 2024-01-27
7 answers
  1. Anonymous users2024-01-23

    1. Generally speaking, the wall cabinet will be made before making the cabinet, due to the structure of the cabinet, as long as the ceiling is installed, the height required for the wall cabinet can be actually measured, which can leave enough space for the cabinet installation, so that the later construction is also convenient and worry-free.

    2. The installation of cabinets will be more complicated, and many components need to be customized in advance.

    The integrated ceiling is installed in a modular way, so it is quick and easy to install, and it can usually be done in one day. Therefore, the ceiling is installed first and then the cabinets are installed, which will not affect the progress and construction period of the entire decoration. And there is no need to worry if you encounter problems, because the gusset module with integrated ceiling can be disassembled, which is convenient and quick to operate.

    3. Since the ceiling is at the top, the construction personnel need to stand on the countertop of the cabinet when installing the ceiling, so that there will be a certain loss to the countertop of the cabinet, and it will affect the overall appearance of the cabinet installation effect. Therefore, the best way is to renovate the cabinets after the installation of the integrated ceiling is completed.

  2. Anonymous users2024-01-22

    Generally, it is to do a good job of installing cabinets on the ceiling, and the opening of the range hood generally does not pass through the ceiling, if there is a conflict, in fact, it is mainly based on your own situation to choose. Next, let's take a look at how to install cabinets!

    1.The first is the installation of the base cabinet, which is called the base cabinet installed on the ground. Before installing the cabinet, the ground should be cleaned first, so as to accurately measure the size of the ground, if the size of the cabinet and the size of the ground are inconsistent, then the gap of the cabinet door can not be balanced, the general installation of cabinet personnel, will be on the wall, floor, measurement, understand the approximate range of space, convenient for the overall cabinet installation.

    2.The second step of the cabinet installation step is to install the wall cabinet, which is installed on the top cabinet. When installing the wall cabinet, it is necessary to measure the size of the wall cabinet suitable for decoration, under normal circumstances, the wall cabinet is about 700 mm away from the cabinet counter, and you can also measure the installation height of a wall cabinet according to your own height.

    3.The installation of the countertop is generally made of artificial stone or solid wood material countertop, no matter what kind of material the countertop, it is very particular when installing, after the installation of the overall cabinet, it may be wrong with the size of the cabinet before it is bought, in order to reduce this error, the installation of the general countertop is the last installation, when installing the countertop, the bonding must be firm and reliable, to ensure that the gap of the countertop is densely connected, and to improve the beauty of the overall cabinet.

    Cabinet installation will inevitably have errors, and these errors cannot be completely removed, but we can reduce the occurrence of errors. In order to reduce the error, we need to pay attention to the fact that we have to repeat the measurement many times before and after the design.

  3. Anonymous users2024-01-21

    There is no absolute order of this, the normal construction sequence is that tiling is the first step, then the ceiling, then the cabinet, like this. But in order to save some money for the ceiling, it can also be changed to make the cabinet first, then the ceiling, and the ceiling follows the cabinet. The first step of tiling is constant.

    If you make the cabinet first and then the ceiling, you can let the ceiling follow the capping plate of the cabinet, so that the ceiling looks straighter. It will also save some money.

    If you first suspend the ceiling and then the cabinet, I am afraid that some of the ceiling will collapse or something uneven, and you can see it at a glance after making the cabinet, which is not good-looking.

    You can do whatever you want.

  4. Anonymous users2024-01-20

    b3cda3dd109bc48007f59755cf20ec92

  5. Anonymous users2024-01-19

    First do a good job of the ceiling, pave the floor tiles, and paint the wall, and then the cabinet size will be accurately measured, which is also a double ruler.

  6. Anonymous users2024-01-18

    The normal construction sequence of Euromonitor is the first step is to apply tiles, then ceilings, and then cabinets! Initial measurement conditions of cabinets: the new house is completed by knocking on the wall; The demolition of the second-hand house completes the determination of the kitchen pattern;

    Accurate measurement conditions: wall tiles and floor tiles are pasted, the ceiling is done, the sink and built-in kitchen appliances are in place, and the water heater is installed.

  7. Anonymous users2024-01-17

    Let's make the ceiling first and then make the cabinet.

Related questions
10 answers2024-01-27

With the improvement of people's living standards, people's demand for bathroom space has gradually changed from a single grooming requirement to a comfortable and beautiful all-round experience. As a result, the integrated ceiling came into being and became the first choice of consumers. So how to choose in the face of so many integrated ceilings, and what kind of bathroom is most suitable? >>>More

7 answers2024-01-27

It is to suspend the ceiling first and then install the lights. >>>More

2 answers2024-01-27

First carry out the ceiling, paint the walls, install water and electricity, and then install the home, sofas and appliances are on the back.

11 answers2024-01-27

When you take the room, you can let the cabinets do the initial amount, help you drain the water and electricity, and then you first finish the kitchen bricklayer, and then find the cabinet maker to do a finer measurement to determine the specific size, as for the ceiling, it is better to install it first, in fact, the impact is not big, custom cabinets are about a month cycle, you can take advantage of this time to do a good job in the kitchen bricklayer decoration.

8 answers2024-01-27

Yes, some people in order to save the ceiling area, on the top of the cabinet that has been installed first, the wooden strips are used to fix the corners of the ceiling, but the formal practice is to first hang the ceiling and then make the cabinet, so that it will not step on the countertop, will not scratch the door panel.