    Solid wood flooring is installed with strict floor leveling requirements. The general attention is as follows: 1. Clean the ground to ensure that the ground is free of debris.

    2. Measure whether the drop of the ground level is within the range that can be adjusted, the ground level crossing error is greater than 4 cm to level the ground or use a double-layer keel, in the case of the length of the Meigu nail is 8 cm, the height of the wooden keel can not exceed the centimeter, to ensure that the part of the Meigu nail into the cement underground is in the centimeter. Calculation method: 8 cm minus keel thickness minus pad height does not exceed cm is equal to cm.

    3. Communicate with the pre-construction personnel and the owner to calculate the horizontal height of the finished surface of the floor to be paved and other ground materials such as marble. The junction between the floor and the marble is treated with moisture-proof, such as the kitchen, bathroom, etc., and the junction between the marble and the floor cannot be resisted to death, because such a part is very susceptible to moisture and arching. 4. Consult whether there are hidden items such as cables and water pipes in the cement floor and their exact locations.

    In some old-fashioned houses, there is a possibility that the direction of the wire or water pipe will pass through the round hole of the floor slab, and the percussion drill is very easy to break the wire or water pipe in the round hole of the floor slab during unaware construction. 5. Observe whether the ground floor meets the construction conditions, some houses sometimes have cement floors that are not concrete reinforced structures but mud and sand flattening, and the layer is thinner, and the percussion drill will penetrate the floor slab and affect the residents downstairs.

  2. Anonymous users2024-01-22

    The secret of laying the floor: "seven points of tools, three points of technology", it can be seen that the importance of tools. Different floors, different places of use, different laying methods, but the tools used are similar.

    Power tools: electric hammers, pistol drills, marble chainsaws, curve chainsaws, steam pumps, steam guns, planers, mills, belt sanders.

    Hand tools: hand saws, knife saws, ink fountains, steel tape measures, angles, pencils, drawstrings, hammers, axes, rubber maces, punches, scrapers, screw cutters, pliers, flat chisels, planers, steel sticks.

    Special tools: Hook lifting, tightening hook lifting.

    The tools are not in order, so that the laying works are not allowed to work. Workers who do not have basic tools are not allowed to work. The engineering team is responsible for preparing all the tools themselves, so that it is easy to manage.

    1. Materials. 2. Base treatment.

    3. Select the pattern to try the shop.

  3. Anonymous users2024-01-21

    Don't lean too close to the wall, generally leave a centimeter expansion joint, the ground must be dry, and the floor should not be too tight. Don't mop the floor with a mop that's too wet.

  4. Anonymous users2024-01-20

    Below to pad more wood, pay attention to moisture-proof before installation, otherwise there will be cracking or arching and other phenomena!

  5. Anonymous users2024-01-19

    Precautions for the installation of solid wood flooring.

    1. The ground should be flat and dry.

    2. During construction, sprinkle insect-proof powder first, and then lay a layer of moisture-proof paper, and the moisture-proof paper should be stacked 20 cm with each other and coated with asphalt oil two to three times. Moisture-proof paper must be spread 10 cm above the corner of the wall.

    3. The keel of the bedding must be dry.

    4. In the humid East China, South China and some particularly humid areas, when installing the floor, do not lean too tightly between the floor and the floor, so as not to get the floor damp in the humid season.

  6. Anonymous users2024-01-18

    If the moderator floor is already ordered, I'll just say install it. 1: The ground is level, and it must be leveled.

    For deck installation, do not lay the entire deck on the ground and nail it, as it will affect the associated area if there is a problem with the entire deck. 4: Find a good master, and it is best to watch the master install.

  7. Anonymous users2024-01-17

    1. Ensure that the ground is dry, flat and free of debris.

    Make sure the floor is dry, flat and free of debris before installing the floor. In general, the installation of the floor can only be carried out after the completion of other decoration works, if the ground is uneven and the installation is carried out, it will make a part of the floor and keel appear suspended in the air, and when people step on it, it will make a sound.

    2. It needs to be left for a period of time before use.

    Hardwood flooring cannot be used immediately after unpacking, and needs to be stored in the house for more than a week. Wait until the temperature and humidity of the solid wood floor and the living room are adapted to each other before use.

    3. Pay attention to check the keel condition.

    When installing the floor, we must pay attention to check whether the keel is dry, under normal circumstances, the moisture content of the dried wooden keel will be about 25%, and the moisture content of the passing wooden floor is generally about 12%, if the humidity difference is too large, it is easy to cause the wood floor to absorb moisture quickly, and the floor will arch and burst the paint surface after a long time. Therefore, it is best to choose dry, straight wood as the keel.

Related questions
4 answers2024-01-27

Please don't put anything in it, it will rot and worm if it takes a long time. Properly lay the imitation solid wood floor, first clean the floor, keep the ground dry and flat, and then lay a layer of moisture-proof film to prevent the moisture of the floor from reflecting water, and then lay the floor on top.

2 answers2024-01-27

1. Pay attention to the material: the wooden floor has rosewood, ash, flowers and trees, etc. 2. Paint quality: the surface should be smooth, uniform and smooth. >>>More

4 answers2024-01-27

1.Dust is wiped gently with a dry mop: Dust or dirt on a solid wood floor can be wiped with a dry mop or a wrung out damp mop. Do not rinse with water, do not mop the floor with a mop with water or scrub with alkaline water or soapy water, so as not to damage the brightness of the paint and damage the paint film. >>>More

6 answers2024-01-27

Friend, have you ever played squash ball? It is estimated that many friends are also hearing Squash for the first time. In fact, in recent years, squash has quietly become popular in some big cities, especially by urban white-collar workers and young people. >>>More

4 answers2024-01-27

As we all know, the anti-theft door has a very prominent anti-theft and anti-skid performance, and its anti-theft and anti-skid performance is mainly determined by its lock cylinder and door leaf material and design, but the advantage of the anti-theft door also needs to be supported by its good installation quality, so its installation quality is also very important. 1. The installation of the anti-theft door should be in accordance with the type of anti-theft door adopted, and the appropriate installation method should be adopted, because the anti-theft door has three divisions of A, B and C, and the installation quality requirements of different levels of anti-theft doors are different. Naturally, the installation method is also different. 2. The door frame of the anti-theft door can be fixed with the wall by expansion bolts, or the iron parts can be embedded at the hole when the wall is built, and the door frame connector can be welded firmly during installation. 3. No matter what kind of connection method is used between the door frame and the wall, there should be no less than 3 anchorage points on each side, and they should be firmly connected. >>>More