What to pay attention to before installing an integrated suspended ceiling

Updated on Suspended ceilings 2024-01-27
5 answers
  1. Anonymous users2024-01-23

    2. Preparation before installation: the kitchen needs to be prepared.

    The gas pipes between the kitchens should be opened first.

    The gas water heater should be installed first (it is recommended that the exhaust pipe seal should not be sealed first, and the ceiling construction personnel will open the hole according to the size on site to ensure the overall aesthetics of the exhaust pipe).

    The size of the opening of the range hood should be provided to the construction personnel, and the size needs to be accurate to the centimeter.

    When installing the flue check valve, the exhaust pipe of the range hood can also be brought, and the ceiling construction personnel are responsible for connecting the exhaust pipe with the check valve. This can be done in one step.

    The ideal location of the lamp is in the middle of the position of the range hood, the kitchen area is relatively large, it is recommended that you install long lights, if the balcony is opened up and enlarged, it is recommended to install 2 lights.

    Toilet installation needs to be prepared before installation.

    If the user wants to install the electric water heater inside the integrated ceiling (semi-package or semi-hidden), the user first installs the water heater and then lifts the ceiling.

    If it is under the ceiling, you can install the water heater first.

    What to look out for in the bathroom.

    The location of the shower room avoids the position of the sewer pipe, which may be the position of the bath bomb, if it is just in the middle of the water pipe, one possibility is that it cannot be installed, and if it can be installed, the entire ceiling needs to be lowered.

    In addition, due to the special nature of the bath bomb, it needs to be exhausted, so avoid the sewer pipe around the bath bomb.

    3. Reserved height: the ideal installation height of the edge strip between the kitchen is best at 230CM from the ground, and the ceiling should not be less than 12CM from the roof, because the main keel plus the auxiliary keel has 7CM, and the hook is 10CM at 3CM.

    There is also 2CM is the distance of the screw, some people say that 5CM-10CM is fake, because they are not professional, and the choice of ceiling is still professional.

  2. Anonymous users2024-01-22

    1. Measure the ceiling time: the user can notify the door-to-door measurement after the completion of water and electricity and tiles 2. Preparation before installation: the gas pipeline between the kitchen needs to be prepared in the kitchen should be opened first The gas water heater should be installed first (it is recommended that the exhaust pipe seal should not be sealed first, and the ceiling construction personnel will open the hole according to the size on site to ensure the overall aesthetics of the exhaust pipe) The opening size of the range hood should be provided to the construction personnel, and the size needs to be accurate to the centimeter.

    When installing the flue check valve, the exhaust pipe of the range hood can also be brought, and the ceiling construction personnel are responsible for connecting the exhaust pipe with the check valve. In this way, cabinets, range hoods, gas stoves, etc. can be installed in one step after the ceiling is installed. Some people say that it is wrong to install cabinets in the ceiling, how can the height of the ceiling be decided by the cabinets, and the height of the ceiling should be determined by the tiles and the sewer pipes on the top.

    The ideal location of the lamps is to remove the position of the range hood, the kitchen area is relatively large, it is recommended that you install long lights, if the balcony is opened up and enlarged, it is recommended to install 2 lamps The bathroom needs to be prepared before installation The wall tiles can be installed after sticking, and the other is installed after the ceiling is hoisted, so one. It can be ensured that the dust of the perforation will not make things when the ceiling is punched, two. It can also prevent tools or something from falling and smashing other things If the user wants to install the electric water heater inside the integrated ceiling (semi-package or semi-hidden), the user installs the water heater first and then lifts the ceiling.

    The bathroom needs to pay attention to the shower room position to avoid the sewer pipe position, this position may be the position of the bath bomb, if it is just in the middle of the water pipe, a possibility is that it can not be installed, in addition, if it can be installed, it is also necessary to reduce the entire ceiling In addition, in view of the particularity of the bath bomb, it needs to be exhausted, so the bath bomb is around the sewer pipe 3. Reserve height: the ideal installation height of the edge strip between the kitchen is best at a position of 230CM from the ground, and the ceiling from the roof can not be less than 12CM, Because the main keel plus the auxiliary keel has 7CM, and the 3CM with the hook has 10CM.

  3. Anonymous users2024-01-21

    Before installation, it is necessary to ensure that there is no water leakage and no cracks in the space where the kitchen needs to install the ceiling, and ensure that the corresponding facilities such as water circuits have been laid. Then check whether the installation surface has enough strength, and if it does not meet the requirements of the banquet, reinforcement measures should be taken;

    According to the height required for pre-installed electrical appliances, the height of the remaining space in the room after installing the ceiling is calculated, so as to facilitate the installation of corner lines. In the case of the tile to the top, take a point 230-240cm high from the ground on one side of the wall, fix the overlapping point on the other side of the silver wall with a transparent water pipe, and then play the line, determine the punching position and drill with a diamond drill bit.

    If the height of the ceiling can be determined by the height of the tile, the wooden strip can be used to be 3cm thickness * the length of the wall, and the wooden strip can be fixed on the wall above the tile with steel nails, and the edge strip can be installed with an ink fountain on the horizontal line on the wooden strip according to the determined installation height.

  4. Anonymous users2024-01-20

    Ceiling is an indispensable process in our current decoration, it is usually installed in the living room, living room aisle, kitchen, bedroom and bathroom, different locations use different ceiling methods, you can choose according to the actual situation of the house and personal preferences. The integrated ceiling belongs to the combination of metal square plate and electrical appliances, now the bathroom, kitchen will use the integrated ceiling to deal with, today we mainly to understand how the integrated ceiling is installed, what are the precautions when installing.

    How to install an integrated ceiling - How to install an integrated ceiling

    1. Preparation of integrated ceiling materials.

    Normally, when choosing an aluminum gusset ceiling, its size is 300mm 300mm, 300mm 450mm, 600mm 600mm, which is conducive to the installation of new electrical modules. Of course, the keel material can be made of galvanized steel light steel keel, triangular hanger and triangular keel, trimming strip and so on.

    2. Installation of ceilings.

    a. Determine the place where the ceiling is installed, pull the horizontal line, and hang the light steel keel;

    b, the special triangle card code buckled into the triangle keel, according to the installed square plate specifications between the card;

    c. After the keel is installed, you can directly press the aluminum gusset ceiling into the triangular bone seam to complete the installation of the ceiling.

    3. Selection of electrical modules.

    How to install the integrated ceiling - the installation precautions of the integrated ceiling

    Before installing the ceiling, it is necessary to make sure that there is no water leakage in the place where it needs to be installed, so as to ensure the smooth flow of infrastructure such as circuits; Predict the height of the room after installation, so as to facilitate the installation of corner lines; Check the strength of the place to be installed, and if the strength does not meet the requirements, reinforcement measures need to be taken.

    Integrated ceilings have been widely used in today's decoration, it is easier to install than ordinary ceilings, and they have been modular, and will not be prone to water leakage. For integrated ceilings, the integrated ceilings used in the house are different regardless of location. Some manufacturers of household appliances and equipment will also add the integrated ceiling factor to connect the electrical appliances with the ceiling, so that the installation will be more beautiful and generous.

  5. Anonymous users2024-01-19

    Precautions for installing integrated ceilings.

    It is necessary to determine whether the ceiling is integrated and the form of the integrated ceiling according to the height of the floor.

    The floor height of the dwelling is very important. If the floor height is very low, or even lower than the meter, then it is not suitable to integrate the ceiling in a large area, but the ceiling can be integrated in a small area in the local area, such as hanging a circle around the house more than ten centimeters wide, 10 18 centimeters high secondary roof, embedded upward illumination of the light, and the middle part to maintain the original height, can be used to paint the top, so that the top surface appears to be as high as the sky, but also enrich the top layer. The same effect can be achieved by partially integrating a suspended ceiling in a hidden part of the room.

    For rooms with high floor height, you can freely choose the integrated ceiling mode and shape, which can be arc, round, square, special-shaped roof, or can be divided into two or even multi-level integrated ceiling modeling, and can use a large-area integrated ceiling to reduce the floor height.

    Before installing the ceiling, it is necessary to make sure that there is no water leakage in the place where it needs to be installed, so as to ensure the smooth flow of infrastructure such as circuits; Predict the height of the room after installation, so as to facilitate the installation of corner lines; Check the strength of the place to be installed, and if the strength does not meet the requirements, reinforcement measures need to be taken.

Related questions
7 answers2024-01-27

Ceiling decoration is related to the decoration style of the whole home, and it should also pay attention to the following points when installing: 1. The selection of materials; Now in the interior decoration ceiling project, most of the use is a suspended ceiling, first of all, we must pay attention to the selection of materials, and then we must operate in strict accordance with the construction specifications, when installing, the position must be correct, and the connection is firm. The decorative materials used for ceilings, walls and floors should be non-combustible or flame-retardant materials, and wooden materials are flammable, so they should be fireproofed. >>>More

1 answers2024-01-27

In addition to the thickness of the ceiling, there is also to pay attention to the distance between the air inlet and the air outlet, the standard requirement is that the air inlet and the air outlet should be more than two meters apart, otherwise, the air blown out of the air outlet has not been evenly sent out, it will be sucked back by the return air outlet, which will not only lead to uneven indoor temperature, but more importantly, affect the life of the outdoor unit and the indoor unit.

2 answers2024-01-27

First, the general process of ceiling decoration.

The first is to do a good job in the ceiling decoration planning, determine whether the ceiling needs to be made, if the ceiling is made, what style, color, style should be chosen; Then select the ceiling material; The next step is the material entry and installation and construction stage; After the construction is completed, it is the acceptance stage of the ceiling, and it is also the cleaning and maintenance stage of the ceiling. >>>More

1 answers2024-01-27

At present, in the interior decoration ceiling project, most of the suspended ceilings are used. >>>More

1 answers2024-01-27

Precautions for restaurant decoration 1: The style of the restaurant is best to follow the style of the overall home, if it is your own restaurant, you can also consider taking a style yourself, and the specific style can be determined according to your own preferences. However, if you already have dining room furniture such as dining tables and chairs, it is best to coordinate according to the style of the existing furniture. >>>More