What are the detailed rules for bathroom waterproof supervision?

Updated on Bathroom 2024-01-28
1 answers
  1. Anonymous users2024-01-23

    1.The elevation of the kitchen and bathroom should be checked correctly, and special attention should be paid to the correct elevation position of the floor drain.

    2.The quality of the wall hole at the root of the floor drain and pipeline should be carefully inspected, the wall hole should be dense and qualified, and the root of the pipeline must be caulked according to the requirements during the construction of the leveling layer.

    3.The yin and yang angles should be made into an arc, straight and flat.

    4.Screed construction: If there are voids, cracks, and unequal defects on the base surface, repair and smooth them with cement mortar. The base surface must be firm, flat, clean, free of dust, greasy, wax, release agent, etc., and other debris substances.

    5.The construction of the waterproof layer can only be carried out after the screed is dry, and the construction should be fireproof and waterproof during the construction. Construction workers should wear soft-soled shoes.

    6.After the waterproof layer is completed, the finished product should be protected, and no one should walk around. After the inspection is confirmed, the concealed project acceptance visa can be applied for, and the next process construction can be carried out.

    7.After the waterproof construction is completed, the water storage test is carried out, and no leakage is considered qualified after more than 24 hours. After the installation of the equipment is completed, the secondary water storage test is carried out.

Related questions
9 answers2024-01-28

Lin Jun waterproof coating has special waterproof coating for bathroom home decoration, K11 home decoration, JS polymer cement-based, polyurethane waterproof coating can be used for bathroom waterproofing, and the effect is not bad.

13 answers2024-01-28

Because of the characteristics of the bathroom, the waterproofing of the bathroom also has its characteristics: >>>More

1 answers2024-01-28

Oriental rainbow waterproof. Regarding the waterproofing of the bathroom, it is recommended to redo it, and it is necessary to remove the tiles and re-pave it after the waterproofing. The cost is larger. Therefore, waterproofing is a very heavy step in the bathroom, and it is time-consuming and laborious not to do a good job of rework. If it is blocked, it will also treat the symptoms but not the root cause.

1 answers2024-01-28

The basic waterproof knowledge of the kitchen and bathroom is as follows. >>>More

2 answers2024-01-28

Under normal circumstances, the bathroom is waterproof, the standard practice is that the ground needs to be done all, the wall should be at least meters high, it is recommended to do full height, if it is a light wall, then it must be done full height. >>>More