Bathroom renovation steps

Updated on Bathroom 2024-01-27
12 answers
  1. Anonymous users2024-01-23

    First, the decoration steps of the bathroom of the blank room.

    1. Hydropower transformation.

    The renovation of water and electricity in the bathroom is the first step in the decoration of the bathroom, and there needs to be a detailed design of water and electricity before the cover is built to meet the needs of use and facilitate our life. It is best to be able to make it easier to repair and maintain later. Of course, the design is also about beauty.

    Finally, do a good job in the treatment of concealed projects.

    2. Waterproof measures.

    Household toilets not only have the function of going to the toilet, but also often have the functions of bathing and washing. It can be said that the bathroom is a very humid environment, so the waterproofing of the bathroom must be done in place when decorating. The waterproof coating in the bathroom extends from the ground to the wall, and the thickness is uniform during the painting process.

    It is also necessary to deal with the painting of various pipe fittings at the junction of the ground and the wall.

    3. Tile paving.

    Bathroom tiles are not only decorative, but also enhance the waterproofing effect of walls and floors. Therefore, it is recommended that you choose tiles with concave and convex textures on the surface and waterproof tiles, which are very suitable for bathrooms.

    4. Ceiling design.

    As a shower place, the bathroom often produces a lot of steam, so the ceiling material of the bathroom must also have the functions of waterproof, moisture-proof, corrosion-proof and high-temperature resistance. The common bathroom ceiling material is aluminum gusset.

    5. Bathroom facilities.

    The toilet's toiletries generally include toilets, bathtubs, showers, washbasins, storage, and so on. When placing the bathroom facilities, it is recommended that you make a separate design of the office area, and use a waterproof partition to separate the two areas, so that the two spaces do not interfere with each other.

    2. Precautions for bathroom decoration.

    The bathroom decoration process is understood, let's understand the precautions for bathroom decoration.

    1. The waterproof work of the bathroom must be in place.

    2. When accepting the waterproof project of the bathroom, you must do a 24-hour closed water experiment, and you must not be sloppy.

    3. It is best to choose waterproof, moisture-proof and corrosion-proof materials for the bathroom.

    4. The switches and sockets of the bathroom should be set outside the bathroom.

    5. The wiring arrangement of the bathroom should be reasonable.

    For the bathroom decoration process, we must not be sloppy, especially the precautions in the bathroom. The decoration of the bathroom can be said to determine the quality of our life in the future, especially the layout of the wires in the bathroom is directly linked to our safety.

  2. Anonymous users2024-01-22

    Under the door frame, stainless steel sheets are embedded to prevent decay.

    Bathroom doors are often in a watery or humid environment, and the bottom of the door frame will decay unconsciously, so you can consider removing the damaged parts below for proper repair, and then embedding stainless steel sheets around the door frame to slow down or prevent the door frame from decaying.

    Mirrors are installed on the cabinet façade.

    In order to store some hygiene products, cabinets are often set up in the bathroom, or wall cabinets are made on the wall. If in the cabinets or recessed facades.

    Install shower heads on the washbasin.

    People are accustomed to washing their hair and bathing at night, and their hair is often messy after sleeping, so the number of people, especially women, who wash their hair in the morning gradually increases. Because it is more troublesome to use the shower equipment every time you wash your hair, this problem is solved by installing a shower head on the washbasin. A 10 cm shelf is nailed around the washbasin for ease of use.

    Putting a lot of hygiene products on the washbasin can look disorganized and easy to knock over, so it's a good idea to nail a 10 cm shelf around the washbasin to fit a makeup bottle, brush, toiletry cup, etc. The height of the shelf should not hinder the use of the faucet, and the shelf material can be wood, plastic board, etc.

    Make a notch in the wall around the tub to place toiletries.

    Make a hole seven or eight centimeters deep in the wall around the bathtub and lay the same tiles as the wall, which can be used to store toiletries and other things. This expands the use of space, and it is easy to use, and the bathroom looks orderly. for the elderly and the sick.

    Install handrails. For the elderly, the sick or people with physical disabilities, it is more difficult to bend over, stand and other movements. Therefore, it would be of great help to them if there was something to support them. Installing handrails on the walls next to the flush toilet will help them use the toilet.

    Make use of the space above the flush sink.

    The flush sink of the flush toilet is a place that cannot be reached when using the toilet, and we can use this space to make a wall cabinet with a depth of about 15 cm, so as not to cause inconvenience to people. Toilet paper, hand towels, detergent, feminine hygiene products, etc. can be placed in the cabinet, and the lower part can also be made open and decorated with some green plants.

    Precautions. Cabinets come in a variety of forms, from open spaces to closed drawers to meet practical needs such as storing towels, cleaning supplies, cosmetics and more. If you are equipped with a good perfume in the bathroom and play slowly, it will better reflect the warmth of the family.

  3. Anonymous users2024-01-21

    Hello, the bathroom decoration steps are subdivided, and there are mainly the following steps:

    1. Silent protection for launching.

    2. Sewer pipe masonry.

    3. Clean the ground.

    4. Make a waterproof dam.

    5. Rigid waterproof 1 time.

    6. Fully flexible waterproof for the first time.

    7. The first time is dry, and then the second time is painted.

    8. After the second time is dry, test the water for 48 hours.

    9. Pave wall tiles.

    10. Pave the floor tiles after confirming the lowest point of the ground.

    11. Use Lin Feng's special process for caulking.

    12. Install ceilings and sanitary ware.

    Bathroom decoration renderings.

  4. Anonymous users2024-01-20

    1. Hydropower transformation.

    1. Laying of water supply pipes.

    2. The wall circuit is embedded.

    2. Waterproof measures.

    1. The waterproof measures of the bathroom are a necessary project, and the waterproof coating in the bathroom extends from the ground to the wall.

    2. Bathroom waterproofing is mainly: wall and ground waterproofing.

    3. Paving tiles.

    1. Ceramic tile is the decorative material of the floor and wall of the bathroom, which can not only strengthen the waterproof effect of the wall and the ground, but also have a good decorative effect.

    2. Bathroom tiling is mainly: wall tile paving.

    Fourth, ceiling decoration.

    The water vapor in the bathroom tends to rise to the ceiling, so the decorative materials of the ceiling must also have the performance of waterproof, moisture-proof, corrosion-proof and high-temperature resistance. The common bathroom ceiling material is aluminum gusset.

    5. Install a bathtub.

    6. Bathroom basin device.

    7. Bathroom faucets and hardware devices.

  5. Anonymous users2024-01-19

    Veneer wall tiles, suspended ceilings, lay floor tiles, install toilets, washbasins, bathtubs, install water supply and drainage pipes, install lamps, sockets, mirrors, install towel rods and other hardware accessories.

  6. Anonymous users2024-01-18

    The main materials of bathroom decoration include: wall tiles, floor tiles, ceilings, and bathroom sanitary ware. The basic decoration includes: the bathroom is waterproof, and the wall tiles need to be brushed to enhance the adhesion between the tiles and the wall. Then there is the modification of the water circuit.

  7. Anonymous users2024-01-17

    In fact, the decoration workers and the decoration company know that you need to do a good job of acceptance, such as the acceptance of waterproofing, and you must do a closed water test, and you can only do the next step of decoration after there is no problem!

  8. Anonymous users2024-01-16

    Bathroom water and electricity transformation, waterproofing, then tiling, then the ceiling, and then the installation of sanitary ware, these are similar steps, but it should be noted that it is basically difficult to change after the water and electricity and waterproofing are done, and the quality must be passed!

  9. Anonymous users2024-01-15

    Bathroom

    First: hydropower transformation.

    Second: waterproof treatment.

    Third: tile tiling.

    Fourth: Bathroom pipe sound insulation.

    Fifth: bathroom ceiling.

  10. Anonymous users2024-01-14

    The decoration of the bathroom is more complicated, involving water and electricity, as well as waterproof, generally speaking, the bathroom is more durable with tiles, and then it is necessary to do the ceiling, the ceiling is better to choose and integrate, and the bath bomb, lamps and lanterns can be integrated into the ceiling!

  11. Anonymous users2024-01-13

    Do waterproofing first, then tile it, and then install the bathroom.

  12. Anonymous users2024-01-12

    Design the location and size of the washbasin, toilet, water heater, bathtub or shower first, and then design the water circuit, preferably a design plan;

    Bathroom renovation process.

    2. Lay water, electricity and heating pipes according to the drawings, then clean the ground, and then level the ground with cement mortar;

    Bathroom renovation process.

    3. Start to make the ground waterproof layer, and the coating should be uniform and thick. Pay attention to dead corners during construction, between the wall and the ground, between the sewer pipe and the ground. walls to do.

    The waterproofing refers to the ground, and the waterproof layer of the surrounding side walls is high.

    20cm, there is a bathtub, and the waterproof layer should be all the parts that the shower can spray. Of course, the waterproofing of the four walls can also be done at the top of the wall, and the roof of the bathroom can be waterproofed better;

    Bathroom renovation process.

    Fourth, after the waterproof construction is completed, all the sewers of the bathroom should be blocked, and a "low wall" should be built at the door of the bathroom for water injection test, and the water injection height should be about 10cm. After 24 hours, if there is no leakage on the walls and floors around the bathroom, it means that the waterproof quality of the bathroom is very good. On the contrary, it is necessary to find out the leakage point and carry out maintenance;

    Bathroom renovation process.

    5. After the closed water test is completed, dry for 5-7 days, make another layer of cement mortar on the waterproof coating, and wait for the cement mortar protective layer to dry and then paste the floor tiles. Ground to.

    There is enough inclination in the direction of the floor drain to facilitate drainage, the tiles on the ground should be non-slip and waterproof, and the wall tiles should not absorb water, otherwise there will be color difference. The tile grout should be better colored, not too light or too dark. After pasting the wall and floor tiles, you can carry out the normal decoration on the ground;

Related questions
6 answers2024-01-27

You're welcome, if there is no original tile removal, the work other than the cabinet should be completed in about 10 days, the cabinet is not good, and the processing cycle of each manufacturer is different. >>>More

9 answers2024-01-27

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

2 answers2024-01-27

The main color of clean color is white and another color, light blue, pink, light purple and other light colors are more suitable. >>>More

7 answers2024-01-27

1.You should have bought it at the Xiyingmen Ceramic City on Yishan Road in Shanghai, hehe. The countertops are made of artificial stone, and the ceramic basins are fine, which I often design. >>>More

6 answers2024-01-27

The depth of the tiles in the bathroom is a difficult problem, the deep is easy to do hygiene, and the shallow one appears to have more space. The kitchen can choose dark floor tiles for easy cleaning; It is recommended to choose non-slip bricks in warm colors for the bathroom, so that you will not feel cold in the winter bath! In addition, it is recommended to choose the color of the turn and match your overall decoration style with the color of cabinets, wall tiles and so on!