Seek help! Kitchen tiles and ceilings have been done, can you still change the water and electricity

Updated on Kitchen 2024-01-27
3 answers
  1. Anonymous users2024-01-23

    According to the regulations, the content of the construction team does not meet the owner's use function and use requirements, and the construction team can be required to rework and rectify, and all costs are borne by the construction team;

    Because, the owner of the previous process has not yet passed the acceptance, and the construction team enters the construction of the next process without authorization, and the consequences are at their own risk.

  2. Anonymous users2024-01-22

    Yes, but the bright line is not very elegant.

  3. Anonymous users2024-01-21

    Guerilla... Hit the tile handle. Make up now. ,。It's better to look angry after that.

Related questions
5 answers2024-01-27

First cut off the power supply, use the suction cup (the kind of hook on the tile, made of rubber) to suck the electrical panel, and take off the electrical panel (the suction position should be cautious and the action should be light). Then pull the lamp buckle away, unplug the lamp, replace the lamp, buckle the button, and cover the panel. Replace the lamp with the original ballast. >>>More

4 answers2024-01-27

Waterproof gypscale can also be used, but it is still recommended to use aluminum gusset integrated ceiling, which is durable and beautiful, and easy to clean.

2 answers2024-01-27

Glue a thin copper skin first, and then stick the wallpaper on the outside!

3 answers2024-01-27

It is completely possible to install track lights without a suspended ceiling, as shown in the figure below >>>More