I changed the toilet sewer pipe, how often to test the water

Updated on Bathroom 2024-01-27
4 answers
  1. Anonymous users2024-01-23

    About 24 hours later. After the waterproof coating is painted to form a waterproof layer (about 24 hours later), the water storage is 20 high, and after 24 to 48 hours, see if the water is significantly reduced or go downstairs to see if there are wet water spots on the roof, and if not, it means that the waterproof construction is successful.

    The specific method of waterproofing the bathroom is as follows:

    1. Use cement mortar on the ground to find a slope in the direction of floor drain, but the surface should be smooth. The slope near the entrance is small, and the slope near the floor drain is large.

    2. The pipeline passes through the root of the floor slab and near the floor drain to strengthen the waterproofing. The pipe root building sealing paste is tightly sealed, and the cement is smoothed after the foot guard, and when the waterproof coating is brushed, the glass wire cloth is reinforced with 1 or 2 layers.

    3. The wall is clean and flat, without floating ash and small particles, and the small original corner or slope angle is wiped at the junction of the wall and ground. When brushing waterproof coating, paste 1 2 layers of glass wire cloth reinforcement.

    4. The total thickness of the polyurethane waterproof coating film is required to be more than millimeters. It can't be decided by the number of passes. Brush the root and corner reinforcement layer first, dry the surface at room temperature for 4h, and then paint and scrape the area of Dayou Qingsale.

    There shall be no leakage and bubbling. Brush a large area for 24 hours and then apply the next layer after curing.

    6. The waterproof layer on the ground should be painted 300mm wide outside the door of the bathroom. The waterproof layer of the waterproof ground should be 200mm higher than the ground.

    7. Do a 36-hour closed water test as required. Hope.

  2. Anonymous users2024-01-22

    After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.

  3. Anonymous users2024-01-21

    This can be done in a few hours.

  4. Anonymous users2024-01-20

    If you have glue, try it in 24 hours!

Related questions
1 answers2024-01-27

times the design pressure, in addition to considering the multiplier difference between the design temperature and the allowable stress at the test temperature.

3 answers2024-01-27

At present, there are many kinds of materials used for waterproofing in toilets, and the waterproof effect is basically very good. There are several areas of concern for waterproofing in the bathroom: the floor, the wall, the joints between the walls and floors, and the joints between the water and water pipes and the floor. >>>More

16 answers2024-01-27

After the bathroom is waterproofed, it needs to be thoroughly dried, so that it can do the closed water test, you can contact the residents downstairs in advance, so that the leakage can be informed in time to avoid unnecessary losses of the downstairs residents When doing the closed water test, the depth of water storage can not be less than 20 cm, and the time can not be less than 72 hours, and the water level does not fall is qualified.

1 answers2024-01-27

I am from Jinyang Pipeline, and if I find a leak, I should repair it immediately, and the leakage is not a small problem!

1 answers2024-01-27

The sewer pipe in the bathroom can be wrapped.

The bathroom sewer pipe can be decorated like this: >>>More