The best solution for waterproofing the bathroom

Updated on Bathroom 2024-01-28
1 answers
  1. Anonymous users2024-01-23

    Bathroom waterproofing project is currently home decoration is more prone to problems, to pay special attention to these sensitive areas in the home decoration.

    The main reason for water leakage is caused by the substandard waterproof coating used, so the purchase of waterproof coating is particularly important.

    Before the bathroom renovation construction, it is necessary to determine the design of the water circuit, and the possibility, feasibility and availability of the design scheme must be considered in detail. Lay the water, electricity and heating pipes first, and then level. When doing waterproof construction in the bathroom, the base layer should be treated first.

    Remove the original decoration materials, clean up the floating soil and cement, first use cement mortar to level the ground, and then do waterproof treatment, requiring a smooth and dry surface. When paving the waterproof coating, it should be evenly painted, and there should be no missing brush, bulging and falling off, and the thickness of the waterproof coating layer should not be less than, otherwise it will affect the waterproof effect. During construction, pay attention to the waterproof dead corners, the joints between the wall and the ground, and the joints between the water and water pipes and the ground, which are the most prone to problems.

    After the construction of the waterproof layer in the bathroom, block all the sewers in the bathroom, build a 25cm high barrier at the door, and then pour 20cm high water into the bathroom. After 24 hours, check whether there is leakage on the surrounding walls and ground, if there is leakage, it needs to be repaired in time, and then do a 24-hour water test without leakage after repairing before entering the next stage of construction. After the completion of the water shielding test, it usually takes 5-7 days to make a layer of cement mortar protective layer on the waterproof coating layer, one to protect the waterproof coating layer, and the other is convenient for veneer bricks, pay attention not to damage the waterproof coating layer that has been done.

    After the protective layer of cement mortar is dry, you can pave the wall and floor tiles on it, spray paint or pave the wallpaper, and carry out normal decoration.

    Generally speaking, the waterproof decoration project of the bathroom made according to the above process is very good!

Related questions
11 answers2024-01-28

Ask a good master to do waterproofing - buy waterproof materials (barrels) - start to do waterproofing - do it again after drying - release water after drying to do a leakage test - ask the downstairs neighbor to make sure that the leak is not leaky - OK if it is not leaking

2 answers2024-01-28

The websites of the construction worker's home, the construction network, the construction forum, and the president's home network are all better, you can go inside to see, there are many things in there that are more suitable for you. >>>More

1 answers2024-01-28

You can visit the coating column of China Polyurethane Alliance Network, which has technical indicators about waterproofing technology and construction.

2 answers2024-01-28

Brush the rigid waterproof paint first, and then brush the flexible waterproof coating. That's what I'm usually doing here. I asked a friend who did design, and said that he would generally recommend JCDecaux or Wanshibo's waterproof coatings.

1 answers2024-01-28

The bathroom is not already tiled.

If there are tiles at all. >>>More