Is the workflow of the dishwashing room in the restaurant one clean, two washing and three disinfect

Updated on Restaurant 2024-01-27
3 answers
  1. Anonymous users2024-01-23

    No. It should be one washing, two brushing, three flushing, four disinfection, and five cleaning. Edible tools should be washed and kept clean after each shift, and the food (use) utensils should be "one wash", "two brushes", "three flushes", "four disinfections" and "five cleaning".

    One wash: wash off the leftovers of the tableware, put them in the washing sink and wash them with detergent;

    2. Brush the utensils with a brush or other cleaning tools;

    Three-flush: Wash the utensils using detergent with clean water and rinse at least three times;

    4. Disinfection: disinfection with high temperature, drug or infrared electronic disinfection cabinet;

    5. Cleaning: Put the sterilized tableware in the cleaning cabinet, and seal it to prevent the entry of bacteria.

  2. Anonymous users2024-01-22

    Hello, don't be stupid, you wash dishes like a family, the loss is about millions, the restaurant dishwashing is dishwasher, the grease is discharged into the underground water along with the water, and the kitchen waste is also poured into the special sewer.

  3. Anonymous users2024-01-21

    One classification, two washing, three cleaning and four disinfection.

Related questions
2 answers2024-01-27

100 days KFC and McDonald's looking for part-time jobs, basically 24-hour restaurants, you can go to see, if the restaurant for you to arrange a shift can be sold, or to other employees to change a shift, the salary is about 9 yuan after 10 o'clock in the evening, you can choose to pay three gold, very good, KFC is basically generally part-time, class and part-time work, hehe, I will do part-time work from KFC.

1 answers2024-01-27

It is about 30 square meters to do waterproofing.

During construction, it is necessary to strictly follow the specific construction process >>>More

1 answers2024-01-27

1. Site selection, which is the most important and takes the most time, ranks first 2, decoration, the door is hung early to show the opening time a week in advance, water, electricity and steam exhaust, sewer engineering 3, equipment and appliances procurement, installation and commissioning. >>>More