Toilet waterproofing production process

Updated on Bathroom 2024-01-27
2 answers
  1. Anonymous users2024-01-23

    Haha, it's better to find someone to help you get this, it's very troublesome to do it yourself.

    First of all, you have to take out the things in the pit in the bathroom, it is best to clean the cement powder, brush it clean, and then buy one or two buckets of waterproof materials back, evenly brush in the pit, pour more points into it, and the paint should be about 30 centimeters higher than the pit surface. There is nothing to pay attention to in the back, if you are afraid of saliva, you can put water in, and see if there is water leakage downstairs in two days, and you can install bedpan tiles without leakage.

  2. Anonymous users2024-01-22

    Just brush the waterproof paint to the top. What kind of craftsmanship is there.

Related questions
3 answers2024-01-27

Grassroots treatment and cleanup.

Do the screed. Binding layer. >>>More

4 answers2024-01-27

Waterproof construction technology and precautions.

1. The base layer is cleaned and smooth, solid, no floating dust, no open water, and the details of the nodes (such as pipe roots, yin and yang angles, etc.) are strengthened. >>>More

9 answers2024-01-27

1. Kitchen and bathroom decoration process.

For the decoration of the kitchen, it is not too complicated, but it must be carried out in accordance with the process, first of all, it is to change the wiring of the wires, and reasonably set up the socket according to the placement of household appliances; The second is the waterproofing of the kitchen, and then the laying of tiles, of course, for the kitchen, the oil smoke is relatively large, and all the walls are best to use tiles for paving. Then there is the ceiling work, and finally the customization of the whole cabinet and the furniture needed for the kitchen. >>>More

1 answers2024-01-27

Oriental rainbow waterproof. Regarding the waterproofing of the bathroom, it is recommended to redo it, and it is necessary to remove the tiles and re-pave it after the waterproofing. The cost is larger. Therefore, waterproofing is a very heavy step in the bathroom, and it is time-consuming and laborious not to do a good job of rework. If it is blocked, it will also treat the symptoms but not the root cause.

7 answers2024-01-27

1. Ground leveling before waterproof treatment. The ground is oriented to find the slope in the direction of the floor drain, the slope near the door is small, and the slope near the floor drain is large, which is mastered according to the specific situation. The slope in the shower room is generally about 8-10 degrees. >>>More