How to install the PU ceiling line

Updated on Suspended ceilings 2024-01-27
5 answers
  1. Anonymous users2024-01-23

    1. When installing, first install the line according to the height of the line, and ensure that the lower mouth of the installation is straight when the line is played.

    2. Measure the size, first dock at the installation site, and slightly lengthen it by 1-2mm when cutting.

    3. On the back of the top angle line, use a glue gun to make an S-shaped glue trail up and down, and glue the back of the joint, taking care not to exceed half of the cross-section.

    4. After the line is on the wall, gently rub it to make the glue fully pasted on the installation surface, and fix it with nails at a certain distance (generally about 60 cm).

    5. Use a clean rag to wipe off the glue that has spilled on the surface of the line.

  2. Anonymous users2024-01-22

    Installation method of PU decorative molding:

    1. First mark the construction line board on the wall with positioning marks.

    2. Mark the black positioning line on the wall, draw the intersection point on both sides of the ceiling, make a 45-degree diagonal point, and mark the cutting point.

    3. Use a cutting machine to cut, and the PU line machine with a surface width of more than 12 cm cannot be cut. It is necessary to fix the lines with a saw before cutting. The required size should be cut 5 mm more.

    4.On the back of Jiaxinwang PU decorative lines, the contact between the ceiling and the wall is coated with butadiene glue, and the glue at the interface must be filled evenly. It is also best to lay a wooden block behind the PU line at the interface to prevent the line from pulling.

    5. Use an air gun to fix the wire plate on the wall, and choose authentic stainless dry nails for the nails inside the air gun. If it is a cement wall, fix it with steel nails.

    6. If there is a gap when the PU corner line is docked, please use a utility knife to trim it, and use sand to sand it.

    7. After the wire board is installed, fill the gap with joint glue or silicone, or fill the soil. Repair the nail hole with putty.

    8. Wipe the overflowing butadiene glue with a damp cloth when it is not dry.

  3. Anonymous users2024-01-21

    Whether it is the state, enterprises, industries, media or even consumers, in fact, the patent rights of furniture are not too high. Industry insiders said that the first thing needed is the collective respect and guidance for original design.

  4. Anonymous users2024-01-20

    The Philips HD9220 air fryer adopts an overall white appearance, which is beautiful and generous, and a large number of rounded streamlined lines are designed, which alludes to the theme of fashion and high-end products.

  5. Anonymous users2024-01-19

    It is recommended that you install it like this:

    First of all, we start to install the PU line from the corner, we will place the two PU strips to be installed on the left and right sides of the corner of the wall, and mark the size position on the wall, and then we will compare the PU line with the wall mark, and make a diagonal cut mark on the line.

    Cut the PU line with a cutting tool, apply white latex on the back of the line and the pasted wall, fix the PU line against the wall, and use a nail gun to fix the PU line.

    Next, we install the lines on the other side, the lines and the patterns between the lines should be docked in place, a certain expansion joint reserved between the lines, and the nail holes on the surface can be filled and scraped flat with putty powder.

    After waiting for some time for the putty and glue to dry, you can use sandpaper to smooth out the patch. After the installation of the PU line, you can paint and beautify the PU line according to your own needs.

    ><> precautions: when we install PU lines, we must confirm the number of lines, generally the length of PU lines is 240cm, we measure the total length of the space in addition to 240cm, we can get the total number of PU lines. However, when we buy, we need to book 2-3 more lines to keep the loss.

Related questions
10 answers2024-01-27

PU polymer series products use high-purity urethane as the basic raw material, through scientific formulation, foaming molding, the molded product not only has the effect of solid wood, but also has the following characteristics: >>>More

2 answers2024-01-27

Pull the line, use the hole opener to open the size of your downlight, and connect the line.

1 answers2024-01-27

1, not on the ceiling, the length of the boom is less than 1000mm, you can use the boom of 6, if it is greater than 1000mm, the boom of 8 should be used, and the reverse support should be set when it is greater than 1500mm. The ceiling of the upper person, the length of the boom is less than 1000mm, the boom of the tan can be used, if it is greater than 1000mm, the boom of household 10 should be used, and the reverse support should also be set when it is greater than 1500mm. The boom is fixed on the floor slab with expansion bolts, and the hole diameter is slightly larger than the diameter of the expansion bolt, and the boom and hangers should be treated with anti-rust. >>>More

4 answers2024-01-27

1. The installation of the internal integrated ceiling lamp must be selected in a good position, with good ventilation and lighting environment, and the condition of the wall itself should be checked clearly to prevent the wall peeling phenomenon during the installation process. The ceiling is a must be inspected before installation, and these are the best operating platforms that can be used during construction and installation. Generally, a light steel skeleton is used to make a protective measure in the ceiling. >>>More

2 answers2024-01-27

First, the elastic line.

According to the floor elevation level, use the ruler vertical vector to the ceiling design elevation, bounce on the roof on the keel position line, and bounce the elevation line of the roof on the wall. >>>More