The waterproof layer of the toilet at home is leaking

Updated on Toilets 2024-01-27
7 answers
  1. Anonymous users2024-01-23

    There are two situations in this matter: one is because the maintenance money was paid when the house was bought at that time, and if it was a structural problem at that time, it was the responsibility of the developer. Second, if you change the structure without permission, resulting in water leakage, then your home and the property should negotiate to solve it, and this situation does not belong to the property maintenance.

  2. Anonymous users2024-01-22

    After living for so long, the problem of the house has nothing to do with the property and the developer, as long as it is not a leaking pipe, it is not difficult to solve, and you can even solve it yourself, it is recommended that you go to TAO BAO on that"Don't worry about water leakage and mold"The owner of the shop will consult with you, and he will give you a very professional answer very carefully.

  3. Anonymous users2024-01-21

    There are ways to remedy the leakage of the waterproof layer in the bathroom:

    First of all, try not to damage the original waterproof layer;

    the second is to resurface the floor tiles to do the ground waterproof;

    Third, the wall must be waterproof, the wall should be 30 cm high in the general waterproof treatment, but the non-load-bearing light wall, the whole wall should be waterproof, at least to be meters high. At the same time, pay attention to the waterproofing of the wall adjacent to the shower position should also be meter high;

    The groove of the water pipe in the fourth wall should also be waterproof, and the groove of the water pipe should be made larger than the diameter of the pipe, and the plastering in the groove should be smooth, and then the groove should be brushed with polyurethane waterproof coating.

  4. Anonymous users2024-01-20

    Have been living in the house for 5 years. It has nothing to do with the property or the developer. Solve it yourself quickly. So as not to cause more damage and expense to the downstairs neighbors.

  5. Anonymous users2024-01-19

    After living for so many years, it shouldn't have anything to do with the developer and things, so I spent my own money to find someone to do a waterproofing.

  6. Anonymous users2024-01-18

    To solve this problem, you have to call the property to negotiate.

    This one of yours should be made of concrete. If you agree downstairs, you can use the high-pressure grouting method below, which is more convenient. The price is more favorable. If you're in Shanghai, I can help you out.

  7. Anonymous users2024-01-17

    According to the housing construction quality assurance measures, foundation engineering and main structure engineering, the reasonable service life of the project specified in the design documents, that is, how many years you actually stipulate is how many years; Roof waterproofing projects, such as bathrooms and exterior walls, are subject to a five-year warranty; Two years for heating and cooling systems, as well as two years for equipment installation; The basic decoration is a two-year warranty.

    Your house has passed the 5-year warranty.

    In addition, about the technical and cost aspects of waterproofing.

    Technically, your bathroom is completely renovated and re-waterproofed. Remember to dig on the cast-in-place board, level it on the cast-in-place board, and then do a waterproof layer, test the water, and then restore it after testing the water.

    In terms of cost, if you find a waterproof company to do it, they charge by area. I don't know how big your bathroom is and what facilities are in it, so I can't estimate it. Generally speaking, it is more than 1500 yuan. 3-4 squares should look like 2000 yuan.

Related questions
10 answers2024-01-27

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

6 answers2024-01-27

Toilet leakage is mainly concentrated in the pipe floor drain and around the corner of the wall, and these parts should be focused on when waterproofing. After the waterproof layer is done, the closed water test is carried out for 3 days, and the corresponding parts are carefully observed downstairs, and the decoration is carried out after there is no water leakage.

6 answers2024-01-27

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

2 answers2024-01-27

Toilet waterproofing practices:

1. Ground treatment. >>>More

2 answers2024-01-27

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More