What are the steps for the installation of kitchen equipment

Updated on Kitchen 2024-01-28
3 answers
  1. Anonymous users2024-01-23

    Installation procedure for kitchen equipment:

    Household kitchenware installation is a highly professional engineering project, and its standardized installation procedures are: wall, ground base treatment, installation product inspection, installation of wall cabinets, installation of base cabinets, connection and commissioning of water supply and drainage, installation of supporting electrical appliances, testing and adjustment, cleaning.

    Depending on the design of household appliances and the complexity of the project, the content of the program will vary.

  2. Anonymous users2024-01-22

    First of all, all the pipelines that should be embedded should be completed, but the positioning of each pipeline, socket, disinfection cabinet, pool, gas stove, water heater and range hood should be designed before the embedding, and the positioning should meet the installation requirements of the follow-up equipment (refer to the equipment installation instructions). Therefore, at this stage, it is basically necessary to determine the selection of all equipment and utensils in the kitchen;

    After that, it is to complete the decoration projects such as the tiling of the kitchen, which can be constructed simultaneously if it does not affect the laying of floor tiles at this stage;

    After the completion of the decoration project is the installation of the equipment, the most hidden part is done first, the layout of each house is not the same, the order is not the same, generally the gas pipeline hose part is pulled to the position of the gas stove, and then the installation of the pool, and the rest can be determined according to the actual situation on the site.

  3. Anonymous users2024-01-21

    Decide where to place your kitchen equipment.

    Sockets for kitchen equipment such as embedded pipelines, disinfection cabinets, environmentally friendly oil stoves, steaming cabinets, and range hoods. It is best to install a master switch in these wires of electrical appliances, for the safety of electrical things, and try to turn off electrical appliances at night.

    Placement of kitchen equipment and connecting lines.

    If the stove is gas, it is also necessary to determine the location of the gas pipe and install the gas pipe, the gas stove is connected to the gas pipe, the water is connected, and the pool is installed.

Related questions
5 answers2024-01-28

Kitchen sink is indispensable for every family to decorate, but some of its installation steps are still unclear to many people, here is to introduce, first of all, when designing cabinets, the sink should be reserved, and the approximate size of the sink needs to be provided when ordering the countertop, so as not to meet the rework and redo. The sink should be installed at the end of the kitchen renovation, and the water in the water pipe should be drained before installation. First, install the sink faucet and the water inlet pipe, and the faucet should be installed firmly and the connection should not seep water; After placing the sink in the corresponding position in the countertop, the faucet inlet pipe, and the hot and cold water pipes can not be mistaken; The connection between the sewer pipe of the overflow hole and the filter basket and the tank body is firmly sealed; Install the matching hanging piece between the trough and the table to avoid the small gap causing the trough to shake; To do a drainage test, fill the sink with water, test the drainage of the filter basket and overflow hole, and find that the seepage should be reworked immediately; The edge sealing around the tank body is clamped and leveled with the matching hanging screws, and then the edge is sealed with silicone to ensure that the gap between the sink and the table top is uniform and there is no water seepage; Rinse the sink thoroughly after installation.

1 answers2024-01-28

In the United States, for example, induction cookers are compared to natural gas >>>More

3 answers2024-01-28

First of all, all the pipelines that should be embedded should be completed, but the positioning of each pipeline, socket, disinfection cabinet, pool, gas stove, water heater and range hood should be designed before the embedding, and the positioning should meet the installation requirements of the follow-up equipment (refer to the equipment installation instructions). Therefore, at this stage, it is basically necessary to determine the selection of all equipment and utensils in the kitchen; >>>More

1 answers2024-01-28

Gas cooker equipment, stainless steel conditioning equipment, refrigeration equipment, disinfection equipment, stainless steel pools, food machinery and equipment. Kitchen miscellaneous items, etc.