What should be done with the water pipes in the bathroom? Eagerly

Updated on Bathroom 2024-01-28
9 answers
  1. Anonymous users2024-01-23

    The first is to ensure the quality of your construction. PP-R pipes are no worse than replacement without serious damage. However, it is recommended that you change the valve to a copper ball valve or globe valve for future maintenance, and the copper valve has two sections with union and is hot melt.

    So it can be replaced. The valve must have a service opening for easy maintenance and replacement and opening and closing in the future.

    Bathroom process: water, electricity, heating after the inspection is no problem - waterproof - waterproof test (generally 2 days) - tile laying.

    The ratio of tiled cement is generally 1:2

    When it comes to water heaters, you don't have to go through the open pipe later. You now get the pipe down and bury it under the tiles. The reserved opening can be sealed with a head. If you want to press it to open it in the future, it's fine.

  2. Anonymous users2024-01-22

    The bathroom is now a dark pipe, and you can use red bricks to build the pipes, and the outside is tiled, so that the overall effect is better

    First find someone to change the water and electricity, and show you how to change the water, electricity, or something, and then find a bricklayer to put tiles

  3. Anonymous users2024-01-21

    PPR pipes can be connected to other pipes, and steel pipes or fittings can be connected directly with inner wires or inner wire elbows. The land where PPR pipes are sold should be sold. The performance of PPR tube is very stable, and it can be used for at least 30 years or even 70 years if it is applied darkly.

    If the valve is replaced, brass valves are generally used, and heating pipes are generally used dry pipe concealment, and the branch pipe connected to the heating is surface-mounted, and the branch pipe can be replaced with other pipes or not replaced. Your construction procedure is correct, but I still recommend this procedure to be done by the workers, you are not professional, and it is easy to rework and troublesome if you don't get it right. If you don't understand something, continue to ask or.

  4. Anonymous users2024-01-20

    Hello, I am a designer of a decoration company. It is recommended that the water pipe in the bathroom be re-done, changed to a dark pipe, and the open pipe is one to affect the appearance, the other is to occupy space, the valve is recommended that you replace it with all copper, the ground must be waterproof, the wall must be at least 30cm or more, the ratio of cement mortar is 1:3, and 1 part cement is 3 points of sand.

  5. Anonymous users2024-01-19

    After four years of use, no leakage was found, and the pipe did not need to be replaced.

    Valves are sometimes to be opened and closed, usually on the outside.

    If you are ready to install a water heater, you can lay out the pipe first, leveling - waterproofing - tiling. Strong bottom ordinary Portland cement 1:3 mortar leveling.

  6. Anonymous users2024-01-18

    If you want to redecorate the bathroom, it is best to replace the plumbing to ensure that there is a problem in the future, and it is not clear whether it is the cause there, and it is difficult to repair.

    PPR pipes can be installed with other valves, and can also be installed in the wall for waterproofing, closed water test, cement mortar (1:3), and brick laying.

    If the water heater is installed in the future, if the pipe is reserved, there is no need to go through the open pipe, but the interface should also be reserved.

  7. Anonymous users2024-01-17

    Bathroom decoration, you need to determine the installation location of the washbasin, toilet, shower and water heater, if the original pipe nozzle installation position does not match, whether the washbasin and shower have laid hot water pipes, if not, it is recommended to reinstall the pipe, it is recommended to use aluminum-plastic composite pipe concealment; The valve adopts copper gate valve, which can be concealed, and the valve core is facing outward.

    The ground must be waterproof, the ground is uneven, the proportion of cement mortar is 1:3, 1 part of cement 3 points of sand leveling to do waterproofing, at least 30cm on the wall, there is a shower waterproof need to do a height of 180cm.

  8. Anonymous users2024-01-16

    It is recommended that try not to go directly to the inside of the tile, and it will be more troublesome to maintain in the future.

    Of course, it is unrealistic not to go at all, after all, the wall tiles account for the vast majority of the bathroom area.

    As much as possible, arrange the water pipes into the bathroom, and the branches on the ceiling, especially the joints such as the three-way and four-way, are the most prone to water leakage.

    In addition, in cold areas, it is recommended that the water pipe should be covered with insulation material before concealing the project, so as to avoid cold and hot changes and cause condensation and dripping.

    Before closing a pipeline, it is important to measure the pressure first. In the case of ensuring that there is no leakage, the pipeline is closed and the bricks are veneered.

    If you pay attention to the above situation, you can generally guarantee that there will be no major problems before the next decoration.

    Of course, the pipeline should also choose a regular brand. At present, it is more environmentally friendly, such as PPR pipes, etc., and the fusion pipes are generally more reliable, and the chances of leakage will be few.

  9. Anonymous users2024-01-15

    Is it a repair or a new pipe? Ask your high-quality questions a little bit more clearly!

Related questions
6 answers2024-01-28

The bathroom is best to have a suspended ceiling, because the relative humidity of the kitchen and bathroom is high, and it is easy to peel off after a long time; It is very cheap to use PVC board, and if you really don't want to hang the ceiling, you must also use moisture-proof wall paint.

2 answers2024-01-28

There are traces of water seepage around the urinal drain pipe (not ruptured) and it drips down the drain very slightly.

4 answers2024-01-28

cannot live harmoniously with

5 answers2024-01-28

The surface is covered with tile adhesive, and the joints are glued.

2 answers2024-01-28

During construction, the entire sewer pipe of the toilet should be closed first, and only local treatment should be done; >>>More