More than 5 square meters of bathroom, decoration with a few square meters of tiles

Updated on Bathroom 2024-01-28
2 answers
  1. Anonymous users2024-01-23

    The floor is paved.

    The height depends on the situation, and you can leave a piece of the full shop.

    Floor tile: 1 piece of 300X300mm floor tile = , 1 = piece (300X300mm floor tile).

    Wall tile: 1 piece of 300X450mm wall tile =, 1 = piece (300X450mm wall tile).

    PS, for example, 5 square meters of wall surface needs (300mmX450mm) = pieces (per square meter) = 37 pieces + 5 pieces (loss depends on the situation) = 42 pieces.

  2. Anonymous users2024-01-22

    Tile area = times * floor area = flat.

    Multiply the perimeter of the bathroom floor by the height of the wall to calculate the area to be bricked, and don't forget to subtract the area of windows and doors.

Related questions
3 answers2024-01-28

5 square meters of bathroom decoration does not cost much, to give you a more detailed decoration quotation! The wall and floor tiles are estimated to be about 25 square meters, 3,000 yuan; toilet 800 yuan; basin cabinet 1200 yuan; ceiling aluminum gusset 650 yuan; shower room 1100 yuan; Aopu bath bomb 400 yuan; towel rack, bath towel rack, soap dish three-piece set 480 yuan (space aluminum material); Pelvic mirror 80 yuan piece. straw paper box, toilet brush 50 yuan; basin faucet, shower faucet 750 yuan; hydropower emissions of 1,200 yuan; A set of paint doors is 1350 yuan; A total of 11,060 yuan. >>>More

2 answers2024-01-28

Our PVC floor is slightly better per square about 40-60, and there are cheaper, PVC wallpaper, cheap less than 10 fast meters, shower head, ordinary dozens of pieces, wash basins, dozens to hundreds, squatting, dozens to hundreds, these are material costs, bathrooms to do professional waterproofing, prices are different around the place, probably dozens of a flat, our cheap here is about 20 more than a flat, slightly more expensive than 60 a flat, some of the price is the price of contracted labor and materials, Some of them are not included in the price, you should ask clearly in advance, so as not to suffer losses, and try it for a week after you do it! If you pay first and find that there is a problem with the quality of the project, it will be difficult to find them to repair it >>>More

1 answers2024-01-28

It's not expensive, I'm from Liaoning, in our manual labor alone will cost 500+, and the worker's technology will be him if the technology can be trusted!

4 answers2024-01-28

Suppose the circumference of the ground is about 7 meters. >>>More

9 answers2024-01-28

Generally, what needs to be considered is whether it is required to "use multiple water points at the same time", and 10L is selected for one bathroom; One bathroom and one. >>>More