Do you want to do bathroom decoration and waterproofing in a new house?

Updated on Bathroom 2024-01-27
8 answers
  1. Anonymous users2024-01-23

    If you don't consider sticking tiles for the time being, you can also not paste them, you can use cement mortar to make a layer of 2 3 cm protective layer on the ground, so that it will not have an impact on your own decoration in the future. When decorating in the future, it must be waterproofed again, and no one has moved in yet, and there will be no problem with the waterproof layer.

  2. Anonymous users2024-01-22

    The developer does 30 centimeters can not meet the requirements of use, the regular ground is full of waterproofing, the wall rain to do 1800 centimeters, our owners are basically four walls all painted to 1800 centimeters, it doesn't cost a few dollars to worry about the later stage, it is really troublesome to leak water, and the waterproofing is to be redone. If you consider tiling, you must do a good job of waterproofing, otherwise even the bricks will have to be smashed if there is a problem. If you don't stick bricks, simply make a protective layer of cement mortar.

  3. Anonymous users2024-01-21

    The waterproofing between the ground and the wall should be 80 cm, you must pave the floor tiles, which is the most basic, you can buy a few barrels of paint on the market, find the construction personnel to do, may be troublesome now, but save trouble in the later stage.

  4. Anonymous users2024-01-20

    This is a common problem, if the follow-up of the new house involves changing water and electricity to destroy the waterproof, it must be done, and it must be done as a whole, and the bathroom waterproof made by the developer is only 30cm, which is far from high enough. If there is a shower, it is recommended to be meter high throughout. It is best to ask a waterproof company to do it, and you need to do a 24-hour closed water test after doing it.

  5. Anonymous users2024-01-19

    It is recommended to do secondary waterproofing. One: Even if the rental leaks, you still have to be held responsible.

    And tenants don't have to worry about water. Two: Once the bricks are laid, it will be difficult to do waterproofing, even if you smash the bricks, it is not as smooth as now.

    Waterproof can be brushed by yourself, buy waterproof materials and then brush with water, it is very simple.

  6. Anonymous users2024-01-18

    That will definitely destroy the waterproofing, and it's better to lay it up.

  7. Anonymous users2024-01-17

    Bathroom waterproofing project is currently home decoration is more prone to problems, to pay special attention to these sensitive areas in the home decoration. At present, there are many kinds of materials used for toilet waterproofing, basically the waterproof effect is not bad, but it is necessary to pay attention to the specific construction details of bathroom waterproofing, and repair the problem in time.

    Bathroom waterproof construction process:

    1. Before the bathroom decoration construction, we must first determine the design of the water circuit, and we must consider the possibility, feasibility and availability of the design scheme in detail. Lay the water, electricity and heating pipes first, and then level.

    2. When doing waterproof construction in the bathroom, the base layer should be treated first. Remove the original decoration materials, clean up the floating soil and cement, first use cement mortar to flatten the ground, and then do waterproof treatment, requiring a smooth and dry surface. This avoids leakage of waterproofing coatings due to uneven thickness.

    3. When paving the waterproof coating, it should be painted evenly, and there can be no missing brush, bulging and falling off, and the thickness of the waterproof coating layer shall not be less than, otherwise it will affect the waterproof effect.

    4. Pay attention to the waterproof dead angle during construction, the joints between the walls and the ground, and the joints between the water and water pipes and the ground, which are the most likely places to cause problems.

    5. After the construction of the waterproof layer in the bathroom, block all the sewers in the bathroom, build a 25cm high barrier at the door, and then pour 20cm high water into the bathroom.

    After hours, check whether there is leakage on the surrounding walls and ground, if there is leakage, it needs to be repaired in time, and then do a 24-hour water test after repair, no leakage can enter the next stage of construction.

    7. After the completion of the water shielding test, it usually takes 5-7 days (it takes 5 to 7 days for the waterproof coating to form a waterproof membrane), and then a layer of cement mortar protective layer is made on the waterproof coating layer, one is to protect the waterproof coating layer, and the other is convenient for veneer bricks, and care not to destroy the waterproof coating layer that has been done.

    8. After the protective layer of cement mortar is dry, you can pave the wall tiles or spray paint or pave the anti-wallpaper on it for normal decoration.

    Generally speaking, the waterproof decoration project of the bathroom made according to the above process is very good!

  8. Anonymous users2024-01-16

    1.Bathroom

    The bathroom is a very easy place to accumulate water, and the daily washing is done here, and if there is no waterproof protection, the walls and floors are prone to dampness and mildew.

    Therefore, before tiling in these places, we must do a good job of waterproofing the wall, and the waterproofing must be at least meters high.

    2.Kitchen. The waterproofing of the kitchen can not be ignored, because there will be different degrees of water overflow when washing vegetables and kitchen utensils in the kitchen, which will make the water leak along the gap of the floor drain, which will cause water leakage in the long run.

    Therefore, the kitchen needs to do a good job of waterproof protection, and it is generally recommended that the kitchen floor and wall are turned over to make waterproof.

    3.Balcony. Balcony is often an area that is easy to be overlooked, and the common balconies are open balconies and closed balconies, and open balconies must be waterproof to prevent rain and snow from entering the room and leaking.

    And the enclosed balcony, when drying clothes, there will be water on the ground, so waterproofing should also be done.

    4.Underfloor heating pipes nearby.

    In the home where floor heating is installed, due to the large temperature difference between indoor and outdoor in winter, the geothermal pipes near the doors and windows are very easy to produce condensation and penetrate into the concrete below, so the pipes installed with floor heating should also be waterproofed.

    Underfloor heating and curry waterproofing make it no longer cold and wet in winter.

    5 Basement.

    Waterproofing of a house with a basement is also a must. The basement is under groundwater pressure due to the erosion of groundwater.

    Therefore, basement walls and floors must be waterproofed and moisture-proof.

Related questions
3 answers2024-01-27

1. According to the formal construction requirements, there are additional layers, such as yin and yang corners, parapet walls, downspouts and the like. >>>More

2 answers2024-01-27

What style do you want to wear? The effect of the suspended ceiling is good-looking.

1 answers2024-01-27

Sound insulation is very important, especially in the home, and it is necessary to improve the noise in daily life. It is also necessary to prevent noise in the toilet, such as the sound of flushing, the sound of entering the toilet, etc., and refer to the workshop of the fast space.

1 answers2024-01-27

Look at the decoration style needs of the home, if you don't install a ceiling, you can also use gypsum line to decorate, and the effect is also very good.

5 answers2024-01-27

Advantages: 1. Meet the needs of many people, not in a hurry. >>>More